NYC 9/11 Public Portal Document
An NYCDDC official told us that they had been advised by the Port Authority
that as for the two towers, one tower was built without asbestos and the second
tower had been built with asbestos fire-proofing up to approximately the 40*^
floor. Further, the Port Authority had advised that it had initiated a program
following the 1993 bombing to remove asbestos related materials where
present.had removed accessible asbestos containing material from the WTC
buildings prier-to-September4-j-r In addition. City officials were advised by the
Port Authority and General Services Administration that -Tthere was no asbestos
containing-material in the above ground portions of WTC Buildings 4, 5 and 6.
However, asbestos-containing material was found in the garage structure area at
the WTC sitCT. City officials told us that the City’s Asbestos Control Program
rules did not apply- because of the eme? situation.-While EPA and New
York State asbestos NESHAP regulations require that a notification be filed even
in emergency situations^^-N Nuotification of a NESHAP demolition and removal
operation was not filed for the WT€-demolition and removal of WTC buildings 4,
5 and 6 because City officials were advised by the property owner and one of the
larger tenants, which happened to be a Federal agency, that there was no asbestos
in the above ground structures. . Although this technical requirement was not
metln any event, throughout the WTC site., proper planning was taken in the
removal of asbestos-containing material and -as-set forth below proper
procedures were followed in removing any asbestos-containing material, which
were below grade, and to minimize exposure to asbestos-containing material.
Health and safety meetings were held every day to plan to deal with, among other
things, removal of asbestos-containing material. A number of City, State, and
Federal agencies, including OSHA, DEC, FEMA, EPA, USAGE, and PEP, as
well as the construction managers and Bechtel participated in these
meetings.These meetings were a-eellaborative effort among a number of City,
State and Federal agencies, including the EPA. All participantsagencies,
including-EPAr -contributed their expertise and collaboratively played a role in
the decision making at these meetings. These meetings discussed among other
things eoneeFn-ing-removal of asbestos-containing materiak and the adequate
wetting down of the material. Procedure.s for removal of the material were
continuously revised considering the location and nature of the material and any
other issues affecting removal. Also, in this regard, a site safety plan was created
to address issue.s such as the removal of asbestos-containing material. All
agencies, including the EPA reviewed th[s plan and had input into the final
version of the plan. As set forth below^roper procedures including measures to
insure adequate wetting down of asbesTbs-containing material were taken.City
officials told us that the City’s Asbestos Control-Program rules did not apply
because of the-emergeney situation; Further.-a N YCDDC official told us that tire
Port-Authoi4ty4»d-rernoye4-aeeessible-asbestes-^sentaifHftg-matei4affrorH-the
WTG-bwIdings prior to September-H-..Consequently, in his view asbestos was
not-a-prifflary concern in the denrohtionr
NYC-WTC_000153479
OCR can misread numbers and units. Confirm readings against the page image before using them.