NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/OIG
Document / 15 pages

Fax cover sheet for WTC-related correspondence, July 7, 2003

Machine-extracted title · confidence 100%

Standard fax transmission form used to send documents related to the World Trade Center environmental response efforts.

NYC-WTC_000146052–000146066

Folder label: “OIG

Page image
Scanned page image, NYC-WTC_000146060
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DEP LEGAL AFFAIRS Fax:17185956543 Jul 7 2003 9:10 P.10

Qualification Regarding Our Observations and Conclusions The demolition and debris HSitg]ivai at the World Trade Center site edan ' unpreoedented situation and ihe standard government contradt procedures ^tbat would be used in a normal situation were •s^ae jjfied to deal With the unprecedented. situation. The New York City Department of Design and Construction (NYCDDC) was responsible for demolition and debris removal at the site. NYCDDC entered into awarded four, emergency of^i^ontracts with four construction management companies for demolition and removal. Under the circumstances, written contracts were not executed between the City and the consteuction management companies..rO5 well-as-freontraot fer-wWetting and misting operations at the site were was subc ed under these contracts^ As stated-ab deaj ith the situation- A scope of work was not issued for the construction management work as there was no time for standard planning in this ci stance. Instead, meetings were held every day at 9:00 a.m. to determine the work to be done and verbal directions were issued to the construction managers concerning the work to be done for the day. Another meeting Was held at 5:00 p.m. to det line the progress that had been made that dav and to assist in planning work for the planning the evening work (the work was performed 24 hours a day, 7 davs a week!. Representatives of the four construction managers. various subconsultants and subcontractors, and the staff of various federal, state. and city agencies attended these meetings. New York City officials would then would-work with4hc constcuotion manftgors at the site to tiv to insure that the work was accomplished- Anethor mooting was-hcld at 5:09 p.m, to dotermine the progross that hod-been made-that day and to assist in planning work for-toena^ day. At both meetings. minutes of the previous meeting would be provided so the. ,,„ .c—the previous meeting to aid in dealing with the issues for the ci ■ <L-HIt meeting.WooontaotiBd MS NYCDPG offioiol about demolirion-ond debris removal operations aKhe-site and requested any, Asbestos NESHAF work-practic9S-wore required by tbese-eontractsr’

2ATIONANDPLA NG CONCERNING ASBESTOS- CONTA iOS

NYC-WTC_000146060

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146060Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →