NYPD Guide for Contractors and Building Personnel
Initial Procedure to Obtain Access:
Bunding owner with proof of ownership of building or right to occupy same (e.g. deed, ground lease) or
building manager with management agent registration or odier proof of authority to act on die owner’s
behalf must meet with contractor and together go to NYPD access van at Broadway and Fulton Streets.
Owner, manager and contractor must also have personal photo identification. AU must speak to NYPD
inspector in charge, present personal ID and building credentials. Owner or managing agent will be
required to sign a police release form issued by NYPD whereby owner assumes liability fin* die building, its
contents and occupants. Upon NYPD satisfection of proof of ownershipZmanagement authority and aU
photo ID, NYPD may, in its sole discretion, make arrangements with the owner and contractor and NYPD
to establish a checkpoint and time for access for contractor and its crew.
Woik Crew Access idure;
The contractor is responsible for assembling the entire work crew at the established checkpoint at die
appointed time.
Each crew member must have its own photo ID, and ID establishing its employment by die contractor
{including social security numbar).
Once NYPD has inspected and tpproved aU ID, NYPD will escort the contractor and the entire crew to die
building.
This Work Crew Access Procedure will be repeated eadi d^ access is required.
Lferfi Vehicles for Worik Crews and Equipment:
The contractor is responsible for assembling aU vehicles requiring access for die workday at South and Pike
Streets. Contractor’s mew chief will dien go to die access van at Broadway and Fulton Streets and notify
die NYPD inspector in charge diat aU vehicles are ready and waiting at South Street
The crew chief will dien ride with NYPD to Soudi and Pike Streets where aU vehicles will be inspected and
all personnel ED will be checked. Upon NYPD’s satisfactory inspection and approval of aU vehicles and
personnel, NYPD will escort die contractor’s vehicles to a check^int at die perimeter of the restricted area.
Any other personnel joining die crew at diat time wfll have to present premier ID at diat point Contractor
may be required to undergo another overaU vehicle and ID check at that time. Once NYPD is satisfied and
clears die vehicles and personnel for admission into the restricted area, NYPD will escort the contractor
vehicle(s) to the worksite. This procedure must be followed each and every time die contractor requires
vehicular access to die site.
CONTRACTORS MUST HAVE SUCCESSFULLY COMPLETED NYPD’S INITIAL PROCEDURE