NYC 9/11 Public Portal Document
5
i . www.aldridge-electric.com
[T E CH 1
, 28572 N. Bradley Road
' t Libertyvine, IL 60048
ing projects. But PSCO struggled for ALDRIDGE DRILLED,^AFT .2X847) 680-5200 Telephone
years with operation and maintenance FOUNDATIONS... ^1 (8475:680-5298 Fax
problems before it finally shut down the /n”'' ■■
!
gas-cooled reactor in 1989.
A decade later, the advance of CC tech 1
• Nation Wide Coverage
i ■'
nology, coupled with market incentives • All Soils &RockDrillif^
i through industry deregulation, drove
( All Dimensions & Depths _
PSCO to repower the idle station, using
three GE FAs and three supplementary- •F\ilIService4^urn-Key5Foundatiorfs
1 fired HRSGs. Three power trains were • Drilled S^afts ForAll^ur Foundation Needs —
i
needed to take full advantage of existing • Substation & Transrijifefeion Drilled Shaft Foundations
capacity in the steam-turbine generator.
The first of these trains started operating
in 1998; the second in 1999; the third in
2001. Utility Engineering Corp., Denver,
IK OVERHEAD ELECTRICAL
provided engineering, procurement and DUCT BANK CONSTRUCTION
construction services for all three phases UNDERGROUND ELECTRICAL
of the project. SUBSTATION CONSTRUCTION
With new construction and repower
ing projects moving ahead at breakneck
speed, the order backlog for F-class tur
bines now stretches for years. And the
future may hold even more promise for
GT suppliers, as newer G- and H-class I ■ *•
fi
machines move toward commercializa
tion. These next-generation designs will NKM*—
use steam rather Sian air to cool hot-gas-
path components, thus enabling firing
temperatures—and subsequently thermal '^■•^1 in
efficiencies—to be increased.
In the “partially” steam-cooled G-class,
steam cools the combustor to maintain
the same level of NOx emissions as earlier
1
I models, but at a higher firing tempera
ture—approximately 2,580°F, versus
2,400°F for the F-class. The Siemens West
inghouse W501G also features an aggres
sive compression ratio for a design effi
ciency of58% (LHV), in CC configuration.
The first operational steam-cooled
GTs in the U.S., W501Gs from Siemens
Westinghouse, are PG&E National Ener
gy Group’s 360-Mw combined-cycle Mil ■s?i
lennium powferplant in Charlton, Mass.,
and the City of Lakeland, Fla.’s, McIn ' -A
tosh 249-Mw simple-cycle unit. Both
achieved commercial operation in 2001.
In the fully steam-cooled H-class,
steam cools the combustor, plus turbine
blades and vanes, enabling a firing tem
perature of 2,600°F. The GE version of
the H-class GT also employs the world’s
largest single-crystal airfoils, which are
intended to make the turbine blades
I more resistant to high-temperature
cracking than the multidirectional crys H What’s the Value of a Good Night’s Sleep? J
tal design used in most of today’s GTs.
GE’s first H-class unit is under con . As a family-owned business i'ri ils third gengralion', Graycor has been providing consirucrion
struction at the Baglan Energy Park in services across the country lor 80 years. Safety, quality and reliability are our trademarks. In
South Wales, U.K., scheduled for start-up Graycor is one of only a handful of contractors with ISO 9000 registration. Let us buiftfiws®
in the summer of 2002. The single-shaft project. Grayc'or—always taking on the hard jobs. 708.206.0.500
CC—a 36-ft-long, 15-ft-dia, 370-ton behe
moth—is designed to break the 60%
thermal efficiency barrier (LHV).
Advances in GT technology are driving
POWERPLANT CONSTRUCTION’S?
NYC-WTC_000141983
OCR can misread numbers and units. Confirm readings against the page image before using them.