NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 06/No Info.
Document / 72 pages

Illegible document fragment with reference number

Machine-extracted title · confidence 30%

Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.

NYC-WTC_000143354–000143425

Folder label: “No Info.

Page image
Scanned page image, NYC-WTC_000143402
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I

9

PLANNING into the it system. Gulf Interstate Engineering Co., 1700 We.st Loop South, P.O. Box 562S8, and microbial attacks. Schoor Depalma, U.S. Highway 9, Manalapan 07726-3072. AU^RA URS Corp, has been awarded a Houston, Texas 77256-62SS. contract by the U.S. Forest Service to pro­ lEW WRI The Battery Park City Authority vide a wide range of environmental engi­ IUimiS>NEW JEBEY-PEHiSYW«l* Wash­ has awarded a contract to Parsons Brinck­ neering services at the Tongass National ington Group International is one of two erhoff Power to serve a.s program manag- Forest. Most of the work in this three-year firms selected by Exelon Nuclear as engi­ er/owner’s representative for tlte develop­ contract will be attsociated with investiga­ neer of choice to provide engineering ser­ ment and implementation of die Battery tions at former mine sites and logging vices for its 17 nuclear power generating Park City energy master plan. The contract camps. URS Corp., 2700 Gambell St., Anchor­ units at 10 sites located in the states listed involves managing energy consultants that age 9950.3. above. The value of this contract for over will develop the energy master plan, imple­ the next three years is estimated between menting the projects recommended in the mNEemT-MmMHIBETTS- NEW $20 million and $30 million. It will also energy master plan and providing con­ MAlKIIRMBaaSE SI Y IK .«( include two options for one-year exten­ struction management services during PEHiSYWIIA-IHOBE BIAMD Gulf Inter­ sions that could bring the total period to construction. Projects under consideration state Engineering Co. has been awarded a five years. Washington Gmtft International could possibly include combined heat and contract by Tennessee Gas Pipeline to Inc., 720 Path. Blvd., Boise, Idaho S3729 power, fuel cells, microturbines, and/or provide design services for their 2002 solar voltaic. The energy program at Bat­ Drawing Currentization Project, which jgUggy Qjy pf Hoboken has tery Park City is slated for completion in consists of 322 meter stations in its ttorth- retained Schoor DePalma to design a new 2007. Parsons Brinckerhoff Power, One Pen.n ern district. The .scope will include site synthetic turf soccer field at Sinatra Park Plaza, New York City 10119. visits to each of the meter .stations located in Hoboken. This field will replace an Much Information for Pulse is derived from F.W. throughout the above-mentioned sates, existing natural grass soccer field and Dodge, a Division of the McGraw-Hill Companies. For updating drawings with collected field provide a safer, more durable playing sur­ more information on a project in Pulse, which has a information, then submitting final, updat­ face. It also will better withstmd weather, OR#, please call 1-800-FW DODGE (1-800-393-6343). For general Information about Dodge products and ed drawings to Tennessee Gas Pipeline foot traffic, sunlight, pollution and heavy services, call 1-800-FW DODGE or visit our Website at and inputting the current information weight, as well as resist rot, mold, mildew' www.fwdodge.com.

At first you only see the fin. What you don’t see is the power beneath the surface. At Nicholson, our Pin Piles - Strength is underground, beneath buildings and . Y 4»»c»»ors • behind walls. While our ^.GroMng - '^n’t always visible, it provides powerful solu­ Vibro * tions for earth retention, slope stabilization, dam , 0/aphragm ■ Wolfs remediation, structural f support and underpinning.

So if you’re looking for robust solutions to 'issasfc' complex geotechnical problems, call...

I

A RodiO G iompany Versatile Geotechnical Contractors 12 McClane Street i Cuddy, PA 15031

Beneath the Surface 412.221.4500 • 412.221.3127 fax www.nicholson-rodio.com

NYC-WTC_000143402

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000143402Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Industry publication, December 2001 · Box DEP Box 06

NYC-WTC_000141922

McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.

32 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.976

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000143435 · Box DEP Box 06

Newspaper excerpt discussing conflicting demands for the Freedom Tower design, including office space versus symbolic height.

Filed in the same folder

Compare copies and versions →