NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 06/No Info.
Document / 72 pages

Illegible document fragment with reference number

Machine-extracted title · confidence 30%

Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.

NYC-WTC_000143354–000143425

Folder label: “No Info.

Page image
Scanned page image, NYC-WTC_000143403
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Thousands of Contractors Use HCSS Everyday OHIO The Columbus Public School District has selected URS Corp, as executive architect for a Sl.S-billion program to rebuild and renovate over 120 school facilities in Columbus. URS is one of tliree firms that will provide architectural and engineering design services for the ri school district’s construction of more til v>/ titan 50 buildings and the renovation of Powerful climating software for projects nearly 70 structures. The initial assign­ ranging from $50,000 to over $1 billion. ments include development of a compre­ hensive implementation plan and master planning in anticipation of bond passage & in November. I 'HS Corp., 277 kk Nationwide Bb)d., Columlncs 4320. " ’Ay PEHNSYlVANtt East Whiteland Township Complete job tracldng software that has selected Schoor DePalma to perform transforms job site information into valuable an inflow and infiltration study of die san­ management information on a daily basis. itary sewer system. The study will com­ • HCSS Customers bine staic-of-thc-art flow monitoring pro­ cedures with geographic information Bequest a Multimedia Demonstration CD Today! systems digital mapping technology to create an interactive tool that rhe town­ at d css ship will use to pinpoint areas where ground and surface water may be infiltrat­ 800-683-3196 • www.hcss.com • [email protected] ing the sanitary sewer .system. Schoor Depal­ ma, Schom DePalma, U.S. Highway 9, Manala­ pan. N.J. 07726-3072. n^MIng PnsvistsrsfEsSiaaSng sr,dM Tracldng Ssflwsrs for ttisSnfrsstructurs Con^usSon industr,- BHOBI ISLAND EDI Ltd. has been awarded a conuaet valued at more than $1 million for network design project at Brown U ni­ 1^ BUILDINGS versity in Providence, fhe con tract calls for a four-pha.se plan designed to take the university to a new level of data network­ ing capability. It involves network model­

f/BlGTO ing, infrastructure upgrades, security and redesign, ultimately allowing the school to use the latest technology and provide consistency across the campas. The first 1400-27741677 I On-site Warehousir^ phase, conducting a complete campus Containmmt Enclosures survey of infrastructure and system net­ • SIZES AVAILABLE: 12'-1M‘Wide works, is under way. Total completion of Weld Fabricatimi Shops • Up To 62' High By Any Length this multiphase design project is expected in 1.5 months. EDI Ltd., 550 Kennesaw Ave. • Designed for Heavy Wind/Snow Loads N. W, Marietta 3006(E690!. • No Foundations Required (Most Sizes) • Crane Liftable and Wheel Mountable CONTRACTS/BIDS/PROPOSALS • Installations Worldwide 60HNEGTISUT A $72-inillion bakery is

I Long and Short Term Solutions being built by Suitt Construction Co. for Pepperidge Fann Inc. l.ocaled in Bloom­ field, just north of Hartford, the 265,000- sq-ft facility will meet all Food and Drug Administration regulations for sanitation and safety. Completion is scheduled for June 2003. Suitt Construction Co. Inc, 1400 'Cleveland St.. Greenville, S.C. 29604. Much Information for Pulse Is derived from F.W. Dodge, a Division of the McGraw-Hill Companies. For more information on a pri^eot in Pulse, which has a DR#, please call 1-800 f W DODGE (1-800-393-6343), For general Information about Dodge products and services, call 1-800-FW DODGE or visit our Website at www.fwdodg8,com. www-bigtopshe(ters.coiT) • saies@bigtopshetters,com • PH 850'584-7786 • FAX 850-684-7713

52 ENR/SEPTEMBER 9. 2002

NYC-WTC_000143403

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000143403Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Industry publication, December 2001 · Box DEP Box 06

NYC-WTC_000141922

McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.

32 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.976

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000143435 · Box DEP Box 06

Newspaper excerpt discussing conflicting demands for the Freedom Tower design, including office space versus symbolic height.

Filed in the same folder

Compare copies and versions →