NYC 9/11 Public Portal Document
• $ 100 million for “Capital Investment Grants” for “transit agencies most
severely impacted by the terrorist attacks..(administered by the Federal
Transit Authority)
Department of Housing and Urban Development:
• $2 billion for Lower Manhattan Redevelopment Corporation
This PEA does not evaluate a number of the on-going emergency actions that have been
covered under FEMA statu! -ry exclusions and which have received emergency permits
from the applicable regulatory agencies, including the Army Corps of Engineers and U.S.
Fish and Wildlife Service. These actions include the massive debris removal effort that is
estimated to encompass over 1.6 million tons (cubic yards) of debris and approximately a
1 year of effort to completely remove the remains of the destroyed buildings and their
contents. The debris disposal is taking place at the Staten Island Landfill and is being
monitored by the New York State Department of Environmental Conservation
(NYSDEC). In addition, several areas have been dredged to allow for debris removal
operations (barge access) and for temporary ferry service necessitated by the loss of the
subway and PATH train access to lower Manhattan. The dredging operations were
permitted by the USAGE and dredged material is being deposited at the Newark Bay
Confined Disposal Facility (CDF) in Newark, New Jersey.
2.2 DESCRIPTION OF ALTERNATIVES
The actions evaluated in this PEA reflect the complete destruction of several of the World
Trade Center buildings, substantial damage to adjacent buildings, and massive damage to
the roads, utilities, subway, and the underground PATH train infrastructure in the vicinity
of the collapsed buildings. Consequently, emergency activities have served to protect
lives, remove debris, and to restore utility services lost on September 11, 2001. It is
anticipated that while the majority of actions would entail the repair or replacement in
kind of damaged facilities and infrastructure, there may be opportunities to incorporate
upgrades and hazard mitigation components into projects. The area of study with
community board boundaries is represented by Figure 1-3. In addition, emergency
transportation measures have and would need to be taken to provide critical access for
people who live work and visit the WTC vicinity.
The proposed action is typically the alternative that has been proposed by the
applicant/grantee as their preferred alternative. The piupose of this section is to list and
describe the proposed actions in detail adequate to develop accurate assessments of
potential impacts described in Section 3.0, and to provide a boundary of application of
this PEA (future projects outside of these listed projects o. assiuned scope would require
additional study). These alternatives do not provide site-specific project details, but
rather describe a typical application of each alternative. A detailed, site-specific
discussion of the proposed action and alternatives would be provided in each project
specific Supplemental Environmental Assessment (SEA).
2-3
NYC-WTC_000141687
OCR can misread numbers and units. Confirm readings against the page image before using them.