The alternatives rely on the knowledge and experience of the local agency to determine
which projects are best suited to New York City’s requirements and preferences.
Proposed actions and alternatives have been designed by applicants/grantees to meet
specific needs at the project areas. FEMA encourages applicants/grantees to solicit
assistance from local specialized engineers, counter-terrorism planning experts, and other
scientists when designing alternatives. Once alternative'^ are developed. Federal and
State agency c. ordination to assist in identifying resources at specific sites and determine
impacts to those resources is required as a part of each SEA.
There are several important clarifications regarding the scope of alternatives evaluated in
this documents:
• The proposed actions evaluated in this document focus on interim repairs and
recovery projects. The PEA accommodates long-term and large-scale projects
such as reconstruction of major buildings/facilities, realignment of subways
turuiels, and mitigation actions not in the vicinity of the impacted area; however,
these actions may require additional NEPA review.
• The projects evaluated by this PEA focus on the World Trade Center site and
surrounding areas of lower Manhattan. Although projects may be identified in the
other New York City boroughs, these would require additional NEPA review
beyond the scope of this document based on substantially different resource issues
in those areas not covered in this document.
The following describes the alternatives are covered by this PEA.
2.3 DESCRIPTION OF REPLACEMENT PROJECTS
2.3.1 Utilities
No Action Alternative
Under the No Action Alternative, no FEMA funds would be made available to restoration
of utilities. If local governments were unable to implement the proposed actions without
Federal assistance, continued lack of services would continue, and economic impacts
would become increasingly severe for the businesses and residents of the impacted area.
Proposed Action Alternative
The Proposed Action consists of several methods to restore utility services to the area.
The primary utilities impacted include water mains, sewer lines, natural gas, steam, fuel
oil, electric, and telephone lines. Based on the ownership issues in New York City,
coordination is required to take place to allow for road cuts and to allow for work on
multiple utilities to occur simultaneously in one area. The primary alternatives for any
work related to utilities would include: