4.2 ENERGY REQUIREMENTS AND CONSERVATION POTENTIAL
Energy in the form of various fossil fuels, electricity, and natural gas would be required
during construction of any of the proposed action alternatives. Long-term operation and
maintenance activities would also consume energy resources. Energy requirements for the
proposed action alternatives would be similar to pre-disaster conditions and therefore would
have little impact on the energy requirements of the New York Metropolitan Region.
Energy efficient construction materials and devices would likely be installed in accordance
with the energy conservation plan adopted by the City of New York titled, Saving Power,
Saving Mon^: An Energy Efficiency Planfor New York City (New York City Council
2001).
4.3 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF
RESOURCES
Construction, maintenance, and use of the proposed WTC infrastructure restoration
require the commitment of various resources. These resources include the commitment
of labor, capital, energy, biological resources, building materials, and land resources.
Short-term commitments of labor, capital, and fossil fuels would result directly from
construction, and indirectly from the provisions of services to the sites during
construction. Long-term commitments of resources would result directly from
maintenance and occupancy of the commercial and residential buildings, and indirectly
from the provisions of water, sewage, electricity, gas, and solid waste services during
construction and long-term operation.
Duration of the commitment of land, construction materials, underground utilities, and
necessary infrastructure and available resources is long-term. •
4.4 RELATIONSHIP BETWEEN LOCAL SHORT-TERM USE OF THE
HUMAN ENVIRONMENT AND MAINTENANCE AND
ENHANCEMENT OF LONG-TERM PRODUCTIVITY
Short-term commitments would include labor, capital, and fossil fuels that result directly
from construction activities, and indirectly from the provision of services to the any of
the site during construction. Physical systems would be modified during construction.
Commitments of infrastructure would exert a long-term impact on the environment in the
immediate vicinity of each construction site, but no impact on the area-wide environment.
Over the long term, implementation of any of the proposed action alternatives would
enhance the morale and quality of life of all residents of New York and New Jersey.
4.5 UNAVOIDABLE ADVERSE IMPACTS
Short-term adverse impacts from construction of any of the proposed action alternatives
would include the following: soil disturbance and erosion, air emissions, and noise.
Long-term impacts include increase in utility use and potential increase in traffic to lower
Manhattan. These unavoidable impacts, and any related mitigation or funding solutions.