in sufficient detail to allow for redevelopment to proceed. Restoration of the WTC site
would incorporate in-depth studies performed in conjunction with master planning
efforts, project design, and permitting prior to the implementation of construction.
Hazard mitigation projects would also require detailed design prior to implementation.
The purpose of the proposed action is to repair or replace destroyed and damaged
infi-astructure in compliance with the directives of the Robert T. Stafford Disaster Relief
and Emergency Assistance Act within the area of potential effect in lower Manhattan and
to provide the opportunity for funding of hazard mitigation projects to control the threat
of future terrorist attacks.
The need for the proposed action is to provide supplemental federal funds sufficient to
allow timely disaster response actions so that the aftermath of this horrific national
disaster can be expeditiously and efficiently managed and so that planning to minimize
the threat of future terrorist attacks in the designated disaster area can occur.
The purpose of the PEA is to streamline the project review and approval process and
expeditiously respond to requests for project-specific funding developed by the public
assistance applicants. The objective of this PEA with respect to public assistance and
hazard mitigation for the World Trade Center disaster is to repair or replace damaged
public facilities and to reduce the risks of future terrorist actions. The objective of this
draft PEA is also to identify the potential environmental impacts of disaster recovery
activities related to construction so that the project approval process can be streamlined.
Based on project scoping, other objectives of this draft PEA are itemized below;
• To determine the envirorunental impacts of construction, recovery and mitigation
projects proposed for the lower Manhattan impact area
• To identify applicable regulatory requirements and permits needed for
construction projects in particular
• To involve the public, responsible agencies, and stakeholder corporations in the
evaluation and project scoping process
• Establish baseline environmental conditions such as the square footage of
building space damaged or destroyed; level of service of roadways and mass
transit operations; and water, sewer, electrical requirements, footage of telephone
lines and number of cables, volume of natural gas supplies necessary to establish
impacts related to pre- and post-disaster use
• Identify opportunities and develop Memorandums of Agreement (MOUs),
Programmatic Agreements, informal agency coordination initiatives, and to
identify permit requirements appropriate to a programmatic-level analyses
1.4 SCOPE OF THE ENVIRONMENTAL ASSESSMENT
There are no previous Environmental Assessments or Environmental Impact Statements
that need to be integrated with, or influence the scope, of this PEA.