2.0 DESCRIPTION OF PROPOSED ACTIONS AND ALTERNATIVES
2.1 INTRODUCTION AND BACKGROUND
Facilities, roadways, pedestrian and street bridges, parks, subways, terminals, and utilities
would be constricted, installed, replaced, or renovated orrestored during implementation
of the proposed action alternatives. Dredging of sediment around piers may be necessary
to facilitate water-transport of necessary equipment, ferries, and construction-related
materials. Construction activities would generate direct impacts generally associated
with the following operations;
Performance of planning studies, obtaining permits, establishing laydown
yards, pre-excavation clearances (buried hazard identification and
archeological resource investigation), vibration, noise, air emission, and
tunnel management, traffic control, health and safety planning
Clearing, grading (site preparation), removal of surface cover and existing
underground utilities, excavation management (shoring, etc.)
Stockpiling materials and excavated soils, establishing site security and
access, implementation of turmeling and vibration control plans
Shipping and trucking construction materials to the site, managing
construction and demolition waste, managing special and hazardous
wastes
Mixing of concrete, providing fuel (low-sulfur diesel, gasoline) for on-site
equipment
Traffic control and mass transport management; dredging and support
facility construction
Storing construction-related materials (examples: steel girders, supports,
paints; lumber; steel beams; electrical wiring; sheet rode; floor tiles;
ceiling tiles; glass; and, construction-related materials such as nails, bolts,
nails, staples, etc.)
Managing sanitary and solid waste; managing stormwater and pollution
prevention planning; excavation, dewatering and wastewater disposal;
tunneling, vibration, building and street support, and noise controls.
Because of the nature of this disaster, there are likely to be a number of proposed projects
that would be related to the urban setting and opportunity to implement strategies to
counter future acts against homeland security. Consequently, there is an identified need
to develop new policies for identification and implementation of such actions, as well as
a process to integrate the delive FEMA’s recovery programs. It should be noted that
the level of funding available for each project is highly variable depending on the type of
program, project location, and other circumstances and contingencies. Funding may be
specific to individual projects and programs. Projects identified are described
independent of the source of funding although a brief summary of potential funding
sources is provided in the following paragraphs to serve as an overview or introduction to
the complex subject of funding mechanisms.