NYC-WTC_000140593–000140599Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
J 1
ASBESTOS PROJECT MONITOR AND AIR SAMPLING CONTRACT
A. Introduction
All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and Scope of Work, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (OSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). This project shall involve coordinating and monitoring the clean up of debris and air sampling from building apartments in the vicinity of the World Trade Center explosion site.
B. Qualifications
The Third Party Air Monitor and Air Sampling Firm shall be independent of the asbestos abatement contractor. The firm shall have extensive experience in the performance of comparable work at large asbestos projects in the City of New York. The firm’s violation history shall be a significant factor in meeting the qualification requirements.
Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects.
Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.
Proof of qualifications must be presented upon request.
Equipment Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project without delay of project completion time. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 2 to 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.45pm(TEM).
C. Specifications
Clean up activities shall be scheduled for 20 to 30 units per day. Air sampling shall also be provided at 10 to 20 units where clean up activities are not scheduled. Sufficient personnel and equipmentshall be available for project monitoring and sampling.
NYC-WTC_000140593
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000138659
Circulation of latest draft cleaning and monitoring statement of works for WTC for review and comment.
9 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138743
EPA circulates latest draft scopes of work for WTC indoor dust cleaning program requesting comments.
9 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162352
EPA request for review and feedback on draft scope of work documents for WTC cleaning and air monitoring contractors.
9 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161167
Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.
9 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138626
Distribution of revised scopes of work documents for WTC indoor cleaning and monitoring contracts.
9 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139232
DEP requests review of attached Scope of Work documents for mold remediation and air monitoring contracts.
6 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139209
Administrative notice instructs staff to preserve original World Trade Center documents for potential litigation.
6 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138918
Internal DEP correspondence discussing EPA draft scope of work for WTC program and clarifying agency roles and responsibilities.
6 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138725
EPA transmits revised scopes of work for WTC indoor cleaning and monitoring contracts to DEP.
9 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000140280
Document header reiterating the requirement to preserve World Trade Center documents for potential legal proceedings against the City.
Filed in the same folder
Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.
Filed in the same folder
NYC-WTC_000140283
Contract excerpt specifying data submission protocols, laboratory delivery instructions, and monitoring responsibilities for the WTC project.
Filed in the same folder
NYC-WTC_000140284
Addendum to a City contract requiring contractors to handle property claims and authorizing additional financial retainage for performance security.
Filed in the same folder
NYC-WTC_000140286
Review comments on a proposed scope of work document regarding the roles of technicians and monitors in the World Trade Center cleanup process.
Filed in the same folder