NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 05/SCOPES OF WORK IN DOOR AIR & CLEANING
Document / 13 pages

Draft scope of work for WTC dust cleaning, July 2002

Machine-extracted title · confidence 95%

Draft contract detailing EPA and DEP collaboration on residential dust sampling and cleaning services for residents south of Canal Street.

NYC-WTC_000140430–000140442

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140438
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

b. The MonitoiingContractor will document all the necessary informationregarding sampling activities, fill out all field logs, data sheets, and chain-of-custody forms. The Monitoring Contractor shall use F2L for all sample and chain-of-custody documentation. Samples must be labeled and accompanied with completed chain-of-custody forms before shipping to the designated laboratory. The label must include the EPA Project Tracking Number. Samples will be packed, sealed and shipped daily by courier for next day delivery to Paradigm Analytical Laboratories at: 2627 Northchase Parkway SE, WilmingtonNC 28405

Deliverables ■h

The Project Monitor shall complete chain-of-custody forms and record the number of wipe samples, EPA Project Tracking Numbers, the laboratory address, date, and sample IDs in an agreed upon electronic format or website approved by EPA within 24 hours of activity.

9. The Project Monitor shall schedule and oversee the cleaning operations ofthe Cleaning Contractor. No residential, common space or HVAC system shall be cleaned until the exterior ofthe building has been cleaned or has been inspected and found to be free of dust or debris form the collapse ofthe WTC. No residential or common space shall be cleaned until the HVAC system has been evaluated and cleaned as necessary. Ifa scheduling problem arises the Project Monitor should contact EPA. The Proj ect Monitor shall coordinate daily access for cleaning and sampling with residents, owners, the Cleaning Contractor and sampling technicians.

10. The Monitoring Contractor shall provide sufficient personnel to provide periodic (3-4hours/unit) oversight ofthe Cleaning Contractor to verify that work is being conducted in accordance with the Cleaning Contact Scope of Work.

11. The Project Monitor shall verify that the Cleaning Contractor is using properlytrained and certified NYSDOL and NYCDEP certified workers.

12. The Project Monitorshall conduct routine quality assurance inspections during the course of cleaning and concur by initialing the Cleaning Checklist (to be developed) fortasks completed in compliance with the Cleaning Contract Scope of Work.

Deliverables

The Project Monitor shall submit the completed Cleaning Checklist via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

13. Personal Air Monitoring Personal air monitoring shall be performed by the Monitoring Contractor in accordance with

9

NYC-V\/TC_000140438

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140438Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →