NYC 9/11 Public Portal Document
forms. The Monitoring Contractor shall use F2L for all sample and chain-of-custody
documentation. Samples must be labeled and accompanied with completed chain-of-
custody forms before shipping to the designated laboratory. The label must include the
EPA Project Tracking Number. Samples will be packed, sealed and shipped daily by
courier for next day delivery to Paradigm Analytical Laboratories at: 2627 Northchase
Parkway SE, Wilmington NC 28405
c. Personnel collecting wipe samples shall be familiar with and experienced in the collection
of wipe samples using the specified sampling method.
Deliverables
The Project Monitor will keep a field notebook and document sampling locations (including a field
sketch). The Project Monitor shall complete chain-of-custody forms and record the number of
wipe samples, EPA Project Tracking Numbers, the laboratory address, date, and sample IDs in
an agreed upon electronic format or website approved by EPA within 24 hours of activity.
10. The Proj ect Monitor shall schedule and oversee the cleaning operations ofthe Cleaning Contractor.
Prior to initiating the cleaning ofany residence, common space or HVAC system the Monitoring
Contractor shall verify that the exterior ofthe building has been cleaned or has been inspected and
found to be free ofdebris from the collapse ofthe WTC or shall obtain written authorization from
EPA to proceed. No residential or common space shall be cleaned until the HVAC system has
been evaluated and cleaned as necessary. If a scheduling problem arises, the Project Monitor
should contact EPA. The Project Monitor shall coordinate daily access for cleaning and sampling
with residents, owners, the Cleaning Contractor and sampling technicians.
11. The Monitoring Contractor shall provide sufficient personnel to provide periodic (3 -4hours/unit)
oversight ofthe Cleaning Contractor to verify that work is being conducted in accordance with the
Cleaning Contract Scope of Work.
12. The Project Monitor shall verify that the Cleaning Contractor is using properly trained and certified
NYS DOL and NYC DEP asbestos certified workers.
13. The Project Monitor shall conduct routine quality assurance inspections during the course of
cleaning and concur by initialing the Cleaning Checklist (to be provided by EPA) for tasks
completed in compliance with the Cleaning Contract Scope of Work.
Deliverables
The Project Monitor shall submit the completed Cleaning Checklist via F2L or an agreed upon
alternative electronic format or website approved by EPA within 24 hours ofactivity. The Project
10
NYC-WTC_000139121
OCR can misread numbers and units. Confirm readings against the page image before using them.