electronic format or website approved by EPA within 24 hours of activity.
11. The Project Monitor shall schedule and oversee the cleaning operations of the Cleaning
Contractor. No residential, common space or HVAC system shall be cleaned until the exterior
of the building has been cleaned or approved by EPA . If a scheduling problem arises the
Project Monitor should contact EPA. The Project Monitor shall coordinate daily access for
cleaning and sampling with residents, owners, the Cleaning Contractor and sampling
technicians. It would be usefill for either EPA to furnish or EPA to require the contractor to
develop a flowchart Or decision tree for EPA approval that outlines the sequence of decisions
or events for an indivdual residence or building. J|r
12. The Monitoring Contractor shall provide sufi It pommel to provide periodic (3-
4hours/unit) oversight of the Cleaning Contractc verify that work is beingxonducted in
accordance with the Cleaning Contact Scope of’
13. The Project Monitor shall verify that the CleanOg Con ing properly trained and
certified NYSDOL and NYCDEP certified workers.
14. The Project Monitor shall conduct ro^«4uality assura|ce inspections during the course of
cleaning and concur by initialing th^peaning (Checklist ('to be dc\'eloped) for tasks completed
satisfactorily.
Deliverables
The tejject Monitor shall review all delive^•abk•^ prior to submission to EPA. The review
shall assure that each deliverable is accurate and complete, technically sound, and free of
clerical errbrs.
The Prt ict Monitor shi ; the completed Cleaning Checklist via F2L or an agreed
upon ay; »nic or website approved by EPA within 24 hours of activity.
15. Personal Air Mon
Personal air mon] tonng for asbestos shall be performed by the Monitoring Contractor in
accordance with J pDOL OSHA requirements. The person who conducts sampling shall
possess a valiM S DOL certificate. Personal air monitoring will be performed on a
^minimum of one worker per shift per apartment during for the first 6 weeks of cleaning
operations. 'This may be extended based on a determination made by EPA, DEP and OSHA.
Tliereatier personal air monitoring samples will be taken at one sample per quadrant per day.
AH samples shall be collected and analyzed in accordance with NIOSH 7400 Method for
PCM and 7402 for TEM. Analysis of these samples shall be the responsibility of the
Monitoring Contractor. Results of analysis shall provided to EPA by the laboratory in an
approved electronic format within 24 hours of collection. Copies of the results shall also
be sent immediately to DEP, OSHA and the employer. The employer will make these
results available to the employees or their designated representatives for their review