NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/E-Mails Hotline M. Gilsenan
Document / 15 pages

WTC cleaning and monitoring SOWs draft review, June 2002

Machine-extracted title · confidence 76%

Circulation of latest draft cleaning and monitoring statement of works for WTC for review and comment.

NYC-WTC_000138659–000138673

Folder label: “E-Mails Hotline M. Gilsenan

Page image
Scanned page image, NYC-WTC_000138665
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Scope of Work B

Application: A visual inspection was performed and the presence ofsignificant accumulations ofdust and/or debris from the collapse of the WTC was identified by USEPA or designee. In some unique circumstances, Scope B maybe applied on a limited basis within a unit as determined necessary by the Monitoring Contractor in consultation with EPA. Residents maybe present depending on these unit specific circumstances. In all other applications ofScope B it is assumed that residents will not be presort.

1. A site specific work plan will be prepared for review and approval by USEPA prior to the start ofwork. This work plan will include detailed procedures for the removal ofdust and debris and the cleaning.

2. An ACP-7 form asbestos project notification form shall be submitted directly to the NYC DEP Asbestos Control Program prior to the start ofwork. NYS DOL notification shall be submitted.

3. At least one asbestos supervisor shall be present at each work place (work place is defined in Title 14, Chapter 1 RCNY as the work area and the decontamination enclosure system).

4. Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this clean-up activity in accordance with OSHA rules and regulations.

5. Warning signs shall be posted at the approach to the work area.

6. A worker decontamination enclosure system shall be installed at the entrance to the work area. A remote decontamination enclosure system shall be considered when appropriate i.e. inability to complywith the provision due to space limitation or other agency rules, such as for compliance with NYCFD egress requirements.

7. HVAC systems shall be shut down and locked out or isolated locally. The site specific work plan shall provide additional information on the HVAC system and proposed procedures for shutdown or isolation.

8. Isolation barriers shall be installed with two layers of6-mil polyethylene sheeting and sealed with tape.

9. Negative pressure ventilation equipment shall be installed and operated during all clean-up activities. Equipment shall run continuously until clearance airmonitoring. Aminimum ofone air change every 30 minutes shall be provided. When ducting to the outside is not possible, a second negative pressure ventilation unit compatible with theprimaiy unit capacitymay be connected in series.

5

NYC-WTC_000138665

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000138665Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →