NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/E-Mails Hotline M. Gilsenan
Document / 15 pages

WTC cleaning and monitoring SOWs draft review, June 2002

Machine-extracted title · confidence 76%

Circulation of latest draft cleaning and monitoring statement of works for WTC for review and comment.

NYC-WTC_000138659–000138673

Folder label: “E-Mails Hotline M. Gilsenan

Page image
Scanned page image, NYC-WTC_000138666
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

10. All WTC debris shall be misted and double-bagged. Accumulation ofwater is prohibited. Water misting shall be sufficient to wet the material without water accumulations. After the removal of debris, all surfaces shall be HEPA vacuumed and wet wiped. Encapsulating agents shall not be applied. Once all surfaces have been HEPA vacuumed and wet wiped, a second cleaning shall be performed. Surfaces include but are not limited to walls, floors, ceilings, ledges, trims and furnishings.

11. Surfaces that may not be wiped shall be HEPA vacuumed three times or disposed as ACM waste. Disposal ofresidents personal property may not occur without prior authorization by USEPAand the owner.

12. A cleaning checklist (to be developed) will be completed by the supervisor at thee completion of the cleaning.

13. A thorough visual inspection will be conducted by the Project Monitor to verify the absence of visible dust accumulations. Additional clean-up procedures shall be performed where visible dust is observed.

14. After successful clearance air monitoring isolation barriers shall be removed in conjunction with the use of a HEPA vacuum.

15. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust accumulations as determined by the Project Monitor. Ifthe apartment does not meet the cleanup criteria of0.0009 fibers/cc(TEM), the apartment will be recleaned at no additional cost and retested, [additional analytical language required]

16. Any damage or loss to that occurs during cleaning is the responsibility ofthe cleaning contractor. The cleaning contractor is not responsible for damage or loss caused by the acts ofparties not involved in the cleanup.

17. All work shall be in compliance with all other applicable requirements ofTitle 15, Chapter 1 ofthe Rules of the City ofNew York and New York Industrial Code Rule 56. Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.

6

NYC-WTC_000138666

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000138666Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →