delayed when the cable,
Construction of the basin was to have commenced during June, but was
Airport as well as serving tens
which serves the Presidcnt' a private hangar at the Westchester County
the pre-construction survey. DEP will
of thousands of upstate customers, was identified during
cable to construct the
supply Bell Atlantic with detailed plans and specifications for crossing the
Avoidance
basin, and is hopeful that construction will commence this summer. The Filtration
Determination requires the Department to begin construction of the basin by the spring of 2002. One
an extended detention basin,
day after construction of Kensico Best Management Practice (BMP) #2,
contractor to halt construction
began on Pepsico property, DEP issued a stop work order directing the
contractually-required erosion
of the basin until such time as he has achieved compliance with the
which the contractor
and sediment control plan. Despite two pre-construction conferences, during
construction sequence) and
and DEP discussed in detail the necessary erosion controls (including the
temporary
their importance, the contractor began excavation of the basin without the controls, or the
the
piping of Malcolm Brook, in place. Piping of the brook is the most critical component of
disturbed soils subject to erosion.
sequencing plan as it eliminates contact between the brook and
Staff will continue to conduct regular inspections.
Hiliview Reservoir
damaged by construction
As noted above, the chlorine feed line to the Catskill Aqueduct was
Chlorination was
activities at Kensico Reservoir on Wednesday morning, August 9, 2000.
monitored at
interrupted from Kensico for just over three (3) hours. Incoming residuals were
added to maintain the
Hillview's Uptake 1 Chamber, where additional sodium hypochlorite was
were maintained to
normal residual arriving at the Downtake Chambers, normal residuals
distribution.
Jerome Reservoir
starting on Saturday
Concerns generated by puddles in the empty South Basin were addressed
standing water to the drain
August 5, 2000, when a crew was sent into the Basin to pump and push
chlorine on August 9, 2000.
line. This was followed by spraying any remaining water with liquid
by the recent
On August 10, another crew was sent to pump and push the new puddles created
South Basin. The backhoe
rainfall. On August 11, a crane was brought in to lower a bacichoe into the
to the drain line. This process
is equipped with a rubber edged plow that was used to push the water
station was shut down at
was successfully completed on August 12, 2000. Mosholu pump
Con Edison's
approximately 3 p.m. on Saturday, August 12, 2000 because of a power failure on
the flow from upstate
1X22 feeder. Since it was not known how long the Station would be down, and
Jerome Pump Station. The
could not be shut down, the Station crew was sent over to activate the
changes. Jerome
Distribution Engineer and his machinist were called in to make the necessary field
was able to restore power to the
Pump Station was on line by 7:30 p.m. Saturday night. Con Edison
was shut down at 9:30 a.m.
Mosholu Pump Station by 8 a.m. Sunday morning. Jerome Pump Station
problems in the affected areas.
and Mosholu was back on line by 10:30 a.m. There were no pressure