NYC 9/11 Public Portal Document
Interagency Matters
Request Made to NYSDOH for Changes in EPA Lead Sampling Program
A letter from DEP has been sent to the NYSDOH reaffirming the successful completion of three
consecutive rounds of EPA lead sampling. In that letter we asked for State confirmation and
acceptance of what we perceive as the ramifications of that success, one of which is the reduction
in future sampling frequency from twice per year to annually. If the State concurs, since our last
sampling was completed in June 2000, the next round would be June 2001. If the State does not
respond within the next few weeks, or if they do not agree with our conclusions, the next round of
sampling would have to be completed this December. While waiting for the response from the State,
the lead unit will be preparing for a December sampling.
Updates
General Water Quality and Quantity
As of November 24, the reservoirs wer 82.9% f capacity. Normal capacity for this time of year
is 70.3%. Consumption for Nove er was 1218.0 million gallons. The quality of
Catskill/Delaware and Croton source water continues to be excellent.
Gowanus Flushing Tunnel Repairs
The shutdown of the Gowanus Flushing Tunnel (GFT) for repairs took place as planned on
November 13`". The contractor disassembled all parts known to need replacement. The replacement
parts were pre-ordered and available. However, inspection of the GFT shortly after the shutdown
disclosed that additional parts were in need of replacement. The remaining replacement parts are
expected to be delivered within a week, along with parts fabricated by DEP machinists. Most
reassembly work has been completed, and welding and other repair work is now in progress. At the
time of this writing, 90% of the repairs are complete and all repairs are expected to be done by next
week. At that point the GFT will be restarted, undergo testing, and be returned to service.
Mosquito Eradication Program Suspendedfor Winter
DEP activities in the mosquito prevention program have been essentially suspended for the winter
months. We have put all of the Mosquito Magnets into storage, and we will no longer do larvae
sampling at most treatment plants but will continue to do random sampling at two plants - Tallman
Island and 26' Ward, to monitor that mosquito population growth stays dormant.
Watershed Inspector General Meeting on TMDLs
DEP staff met with the Watershed Inspector General (WIG) on November 9th to discuss nonpoint
source implementation of the Phase II Total Maximum Daily Loads (TMDLs). The WIG is
interested in helping the implementation process along and plans on participating in future meetings.
Discussion centered on how existing programs can be used to reduce phosphorus loadings within
the watershed (i.e., SEQR and project review) as well as the roles the different agencies will play.
There is a MOA deliverable (to be coauthored by NYSDEC) on this issue due in April 2001.
-5-
NYC-WTC 000137933