NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Box 02-05-2-002/Folder_0047
Document / 169 pages

Folder_0047

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000137580–000137748
Page image
Scanned page image, NYC-WTC_000137709
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Department of Environmental Protection Projects and Initiatives

Project Title Description Start or Announcement Date

Third Water Tunnel - • Construction start of Manhattan branch of Announcement July Manhattan the Third Water Tunnel which run from upper 2001; Construction Start to lower Manhattan through the Borough in a November 2001 "J" loop and spur.

• The current projected cost of the project is $425 million.

• At the same time, an announcement can be made of a new program to create urban greenspaces at several of the shaft sites which will later become construction sites and, finally,

Third Water Tunnel - • As part of Stage 4 of the Third Water Tunnel, Advertising of the bid Queens we will start construction of the Queens valve can begin as soon as chamber, approximately half the size of the final arrangements are chamber in the Van Cortlandt Park. made to move DOT to a Butler building in • This stage will provide and additional source I d l e wi l d Park. for the Bronx and Queens and will also create Construction could an emergency alternative for a backfeed into probably begin Spring Manhattan. of 2001.

• The project is estimated at

Central Park - Lake • This project will improve the water quality of Announcement could be Improvement and Central and Van Cortlandt Park water made as soon as Creation of Gatehouse bodies and will take these systems off the agreement reached with Museum and potable water system. It conserves water and Parks and Conservancy. Education Center; reduces flow to City sewers.by reducing Construction on Lake Restoration at unwanted nutrient loads. In addition, DEP will gatehouses could begin Van Cortlandt Park renovate and restore its three Central Park sometime in 2002. reservoir gate houses in order to create a museum and education center. A walkway across the reservoir's dividing wall will be constructed. • The projected cost of DEP's share of this program is $35,000,000 in capital dollars. Parks andlor the Central Park Conservancy have a share of $14,900,000.

L -1-

NYC-WTC 000137709

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000137709Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

NYC-WTC_000136990

Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.

Similar indexed content

Compare copies and versions →