33 Central ventilation systems (coAtTACHMENT A — SCOPE OF WORK
R •' Dust/Dirt/Debris Suspect WTC• elated Dust
sti ate %of total dust
loading
System Light Heavy
• Component -(<1/l6 inch (2 1116 inch Present?
System Components Substrate Material
. None , depth) depth O'/N)
utside air intake louvers, grates
and/or screens •. ll
Outside air duct (
Outside air.damper(s) X
Return air grilles
Returti airplenum'. S .
Return air plenum damper .
Rerurri air• ucts '
urning vanes
Mixing chambers '.
Filter rack(s) .
Filter batiks/media
Pre-heat coils
Cooling coils
Re-heat coils
Humidification and/or air•cleaning •
equipment
Fire dampers
In-line re-heat coils
Acoustical blower housing lining •
Duct connectors
Blower assembly including blower
wheel, blower housing, air vanes„in-
line noise artenuators, acoustical
treatments (e.g. baffles, duct linings)
Condensate drain pan
Condensate accumulator
Supply air plenum
Supply air plenum damper(s)
Supply air ducts .'
Al
.14igh pressure • main trunk
-Low pressure — branches •
Supply plenum or supply duct
linings '
Supply air duct damper(s)
Supply air diffusers
Terminal-boxes - -
Open or ducted passive ventilation -
shaft(s)
Other Information:
Unit cycled prior to inspection Color of Dust/Dirt/Debris
Filter loading (general impression) • Water damage '
Filter bypass (describe) Visible suspect mold growth
Abraded/delarninated acoustical lining' Evidence of animal incursion (carcasses, feathers, fecal