Document / 69 pages
Asbestos air quality monitoring report, 115 Broadway Machine-extracted title · confidence 95% Consulting and testing services report on asbestos air quality monitoring at various floors of 115 Broadway in September 2001.
NYC-WTC_000132877–000132945 Folder label: “115 BROADWAY Block: 50 Lot: 1 BIN: 1001003 United States Realty Building”
Save to case Cite this page ↗
More like this page Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Invoice for roof cleaning, 2 South End Ave, Mar 2003 · page 6 · Box DEP Box 46 NYC-WTC_000117805
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
Similarity score 0.967 (not a probability)
Inspection Memo, 214-231 Front Street, June 2006 · page 5 · Box DEP Box 52 NYC-WTC_000129127
Memo documenting exterior inspections of vacant residential buildings on Front Street with no visible debris or access issues.
Similarity score 0.966 (not a probability)
Fax transmission record dated October 23, 2002 · page 1 · Box DEP Box 39 NYC-WTC_000110410
Fax cover sheet or transmission log dated October 23, 2002, related to the site.
Similarity score 0.959 (not a probability)
Final Asbestos Report, 133-135 Greenwich Street, May 2005 · page 24 · Box DEP Box 52 NYC-WTC_000127657
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Similarity score 0.957 (not a probability)
DEP environmental monitoring presentation slide, Dec 2002 · page 1 · Box DEP Box 07 NYC-WTC_000144129
Presentation slide from a DEP briefing on environmental monitoring at the World Trade Center site dated December 17, 2002.
Similarity score 0.956 (not a probability)
Asbestos abatement technical specifications, 130 Cedar Street, July 2004 · page 73 · Box DEP Box 50 NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.956 (not a probability)