Document / 37 pages
Final Asbestos Report, 133-135 Greenwich Street, May 2005
Machine-extracted title · confidence 100%Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
NYC-WTC_000127657–000127693Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Inspection Memo, 214-231 Front Street, June 2006 · page 5 · Box DEP Box 52NYC-WTC_000129127
Memo documenting exterior inspections of vacant residential buildings on Front Street with no visible debris or access issues.
Similarity score 0.977 (not a probability)
Invoice for roof cleaning, 2 South End Ave, Mar 2003 · page 6 · Box DEP Box 46NYC-WTC_000117805
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
Similarity score 0.970 (not a probability)
Asbestos fiber analysis report, 110 Reade Street, Jul 2002 · page 2 · Box DEP Box 45NYC-WTC_000114694
Laboratory report detailing transmission electron microscopy results for asbestos fiber analysis at 110 Reade Street.
Similarity score 0.967 (not a probability)
Notebook specification sheet, Oct 2001 · page 54 · Box Asbestos - BOX 8NYC-WTC_000111531
Page listing notebook specifications including dimensions and sheet count for archival purposes.
Similarity score 0.959 (not a probability)
Health Department Forms Folder 1179, 1996-2001 · page 22NYC-WTC_000138239
Archival folder label for Health Department forms related to World Trade Center activities from 1996 to 2001.
Similarity score 0.959 (not a probability)
Asbestos abatement technical specifications, 130 Cedar Street, July 2004 · page 73 · Box DEP Box 50NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.958 (not a probability)