NYC-WTC_000132905
CTSI DAILY LOG SO wxspecrion
ei
Date: Yodly Start Time:_7/’ 3) Finish Time:__ /7£ 30
Technician (s) Name : STOMA bib. _L-Shasor F 42770lTechnician’s License Number: W99-09/0/
Project #: f
Project Client/Address: VAS EfOMe WhY.
VA
Project Location/Area E LX 4, Lge. Bul La ig
Client Rep. (Signature): Client Project Manager:
Asbestos Contractor: C O47 (CO Supervisor: L1/24Q 2/ Beffé
Project Scope of Work (i.e. Air Monitoring, Lead Sampling, Survey, IAQ, etc): Aibett-0 pdt opedeg
Work Area Size: ___ ACM Quantity Removed (specify LF or SF):
Was the work area inspected by a regulatory agency/inspector (DOL, DEP, OSHA, DOH, EPA, etc.): Yes or ED
If yes, state the name, badge #, type of inspection & conversation.
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000132905Source: NYC Law Department, mirrored locally
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…