CTSI DAILY LOG FORM/INSPECTION
Date:_
9/23/a1
Start Time: 7:30
Technician (s) Name : S.Uamka / J. Shamailoi
L.Sharan / A. Kornevich
Finish Time:
Technician's License Number:_
19:30
Project #:
Project Client/Address:
115 Beoadway
Project Location/Area Eutire BRolg.
Client Rep. (Signature):_
Asbestos Contractor:_
Comoo
Project Scope of Work (i.e. Air Monitoring, Lead Sampling, Survey, IAQ, etc.):
Client Project Manager:
Supervisor: M.Bett
Are manitoring
Clean up
Work Area Size:
ACM Quantity Removed (specify LF or SF):
Was the work area inspected by a regulatory agency/inspector (DOL(DEP) OSHA, DOH, EPA, etc.):
If yes, state the name, badge #, type of inspection & conversation.
Samnel Nebech NyZ|DEP
A1 97-03833
Yes') OI NO
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000132903Source: NYC Law Department, mirrored locally
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…