Asbestos inspection report, 102-104 Greenwich Street

Machine-extracted title · confidence 95%

Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.

NYC-WTC_000128550–000128593

Folder label: “102 GREENWICH 1001054, 53/37”

Page image
Scanned page image, NYC-WTC_000128583
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

V as long as manual methods which do not render material and not visible dust is created by the the material non-intact are used to remove the removal method used. In determining whether a job involves less than 25 square feet, the contractor performed on the same roof on the same day. shall include all removalandrepair work When removing cementitious asbestos -containing containing ACM on building exteriors (with the siding and shingles or transite panels ensure that the following work practices are exceptions noted above) the contractor shall followed: • Cutting, abrading or breaking siding, shingles, or transite panels, shall be prohibited unless the contractor can demonstrate that release cannot be used. methods less like to result in asbestos fiber

• Each panel or shingle shall be sprayed with amended water prior to removal • Unwrapped or unbagged panels or shingles via covered dust-tight chute, crane or hoist, shall be immediately lowered to the ground or placed in an impervious waste bag or wrapped in plastic sheeting and lowered to the shift. ground no later than the end of the work

• Nails shall be cut with flat, sharp instruments.

WASTE REMOVAL PROCEDURES A. All asbestos and asbestos contaminated in two properly marked 6-mil polyethylenewaste, after thorough wetting, shall be placed waste too large to place in these containers bags, a properly marked drum, or items of shall be polyethylene sheeting, as permitted by applicable wrapped with two layers of 6-mil regulations.

B. The bags shall be independently twisted and sealed. Wrapped items shall have each layersealed. Drums shall be closed and of polyethylene sealed with duct tape. C. The asbestos containers shall then be moved to the debris port and stockpiled until a sufficient quantity is acquired for removal operations. D. Prior to removal operations, remove the duct tape from all doors of the waste decon. E. A workman in the sealed work area shall use gross asbestos from each debris container andbrushes or HEPA vacuums to remove passing it through the door of the first chamberthen rinse it with a water spray prior to A worker in the Packaging Area of the waste (Packaging Area) of the waste decon. decon shall hold open a 6-mil polyethylene bag into which the worker in the work zone shall place the cleaned

NYC-WTC 000128583

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128583Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →