Asbestos inspection report, 102-104 Greenwich Street

Machine-extracted title · confidence 95%

Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.

NYC-WTC_000128550–000128593

Folder label: “102 GREENWICH 1001054, 53/37”

Page image
Scanned page image, NYC-WTC_000128582
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

L. SIDING AND ROOFING ABATEMENT FOR WORK ONLY (Not Applicable) DEMOLITION OF STRUCTURE

For removing roofing material which contains ACM the following practices are followed: contractor shall ensure that the

• Roofing material shall be removed in an intact state to the extent feasible. • Wet methods shall be used to remove rendered not intact during removal, roofing materials that are not intact, or that will be create safety hazards. unless such wet methods are not feasible or will

• Cutting machines shall be continuously misted during use, unless determines that misting substantially a competent person decreases worker safety. • When removing built-up roofs with surface using a power roof cutter, allasbestos -containing dust resulting from roofing felts and an aggregate collected by a HEPA dust collector, the cutting operationshall be or shall be HEPA vacuumed by cut line. When removing built-up roofs with asbestos vacuuming along the smooth surface using a power roof -containing roofing felts and a shall be collected either by a cutter, the dust resulting from the HEPA dust collector or HEPA cutting operation or by gently sweeping and vacuuming along the cut line, then debris left along with cut line. carefully and completely wiping up the still-wet dust and

• Asbestos-containing material that has been removed from a thrown to the ground. Unless the roof shall not be dropped or shall be lowered to the ground material is carried or passed to the ground by hand, it via covered, dust-tight chute, crane or hoist. • Any ACM that is not intact shall be lowered to the ground as any event no later than the end soon as it practicable, but of the work shift. While the it shall either be kept wet, placed in an impermeable waste material remains on the roof sheeting. bag, or wrapped in plastic

• Intact ACM shall be lowered to the later than the end of the work ground as soon as is practicable, shift. but in any event no

• Upon being lowered, unwrapped such manner so as to preclude material shall be transferred to a closed receptacle in the dispersion of dust. • Roof level heating and ventilation air intake sources shall be system shall be shut down. isolated or the ventilation

Notwithstanding any other provision of this roofing less than 25 square fee in section, removal or repair of area does not require use of sections of intact wet methods or HEPA vacuuming

NYC-WTC 000128582

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128582Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →