Fax cover sheet from J.C. Broderick & Associates, Oct 2001

Machine-extracted title · confidence 100%

Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.

NYC-WTC_000104853–000104885

Folder label: “102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street

Page image
Scanned page image, NYC-WTC_000104878
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

L. SIDING AND ROOFING ABATEMENT FOR DEMOLITION OF STRUCTURE WORK ONLY (Not Applicable)

For removing roofing material which contains ACM the contractor shall ensure that the following practices are followed:

• Roofing material shall be removed in an intact state to the extent feasible.

• Wet methods shall be used to remove roofing materials that are not intact, or that will be rendered not intact during removal, unless such wet methods are not feasible or will create safety hazards.

• Cutting machines shall be continuously misted during use, unless a competent person determines that misting substantially decreases worker safety.

• When removing built-up roofs with asbestos-containing roofing felts and an aggregate surface using a power roof cutter, all dust resulting from the cutting operation shall be collected by a HEPA dust collector, or shall be HEPA vacuumed by vacuuming along the cut line. When removing built-up roofs with asbestos-containing roofing felts and a smooth surface using a power roof cutter, the dust resulting from the cutting operation shall be collected either by a HEPA dust collector or HEPA vacuuming along the cut line, or by gently sweeping and then carefully and completely wiping up the still-wet dust and debris left along with cut line.

• Asbestos-containing material that has been removed from a roof shall not be dropped or thrown to the ground. Unless the material is carried or passed to the ground by hand, it shall be lowered to the ground via covered, dust-tight chute, crane or hoist.

• Any ACM that is not intact shall be lowered to the ground as soon as it practicable, but in any event no later than the end of the work shift. While the material remains on the roof it shall either be kept wet, placed in an impermeable waste bag, or wrapped in plastic sheeting.

• Intact ACM shall be lowered to the ground as soon as is practicable, but in any event no later than the end of the work shift.

• Upon being lowered, unwrapped material shall be transferred to a closed receptacle in such manner so as to preclude the dispersion of dust.

• Roof level heating and ventilation air intake sources shall be isolated or the ventilation system shall be shut down.

Notwithstanding any other provision of this section, removal or repair of sections of intact roofing less than 25 square fee in area does not require use of wet methods or HEPA vacuuming

NYC-WTC 000104878

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000104878Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →