Document / 33 pages

Fax cover sheet from J.C. Broderick & Associates, Oct 2001

Machine-extracted title · confidence 100%

Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.

NYC-WTC_000104853–000104885

Folder label: “102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street

Page image
Scanned page image, NYC-WTC_000104879
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

as long as manual methods which do not render the material non-intact are used to remove the material and not visible dust is created by the removal method used. In determining whether a job involves less than 25 square feet, the contractor shall include all removal and repair work performed on the same roof on the same day.

When removing cementitious asbestos-containing siding and shingles or transite panels containing ACM on building exteriors (with the exceptions noted above) the contractor shall ensure that the following work practices are followed:

• Cutting, abrading or breaking siding, shingles, or transite panels, shall be prohibited unless the contractor can demonstrate that methods less like to result in asbestos fiber release cannot be used.

• Each panel or shingle shall be sprayed with amended water prior to removal

• Unwrapped or unbagged panels or shingles shall be immediately lowered to the ground via covered dust-tight chute, crane or hoist, or placed in an impervious waste bag or wrapped in plastic sheeting and lowered to the ground no later than the end of the work shift.

• Nails shall be cut with flat, sharp instruments.

WASTE REMOVAL PROCEDURES

A. All asbestos and asbestos contaminated waste, after thorough wetting, shall be placed in two properly marked 6-mil polyethylene bags, a properly marked drum, or items of waste too large to place in these containers shall be wrapped with two layers of 6-mil polyethylene sheeting, as permitted by applicable regulations.

B. The bags shall be independently twisted and sealed. Drums shall be closed and sealed. Wrapped items shall have each layer of polyethylene sealed with duct tape.

C. The asbestos containers shall then be moved to the debris port and stockpiled until a sufficient quantity is acquired for removal operations.

D. Prior to removal operations, remove the duct tape from all doors of the waste decon. E. A workman in the sealed work area shall use brushes or HEPA vacuums to remove gross asbestos from each debris container and then rinse it with a water spray prior to passing it through the door of the first chamber (Packaging Area) of the waste decon. A worker in the Packaging Area of the waste decon shall hold open a 6-mil polyethylene bag into which the worker in the work zone shall place the cleaned

NYC-WTC 000104879

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000104879Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.