NYC 9/11 Public Portal Document
I .' . 9. Polyethylene sheeting shall be used to isolate contaminated from uncontaminated
areas. This polyethylene sheeting shall be replaced or repaired immediately if
torn or damaged. One layer of polyethylene sheeting shall be required for walls
and two layers of polyethylene sheeting shall be used to seal open space between
work areas and non-contaminated areas and for all floors. In buildings required
by the Uniform Construction Code to be of noncombustible construction, all
materials used to construct separation barriers must meet the Uniform
Construction Code, building sub code requirements for that building and all
plastics used must be flame resistant.
B. PROPER METHODS OF REMOVAL AND HANDLING FOR LARGE,
SMALL AND MINOR ASBESTOS ABATEMENT PROJECTS
1. Initial activity in the work area shall be conducted in the following order:
a. Remove filters from all heating, ventilating, and air conditioning systems.
Wet the filters and place them in polyethylene bags, double bagged with
visible labels, for disposal as asbestos-containing waste. Squeeze all excess
air out of the bag before sealing to prevent puncture during disposal. Secure
bags by twisting, taping, folding over, and scaling them with duct tape.
b. The contractor shall wet clean and/or HEPA vacuum all non-removable non-
asbestos items such as radiators and suspended light fixtures in the work area,
including built-in equipment; and shall cover with two layers of polyethylene
sheeting taped securely in place;
c. The contractor shall detach and wet clean removable electrical, heating, and
ventilating equipment and other items, which may be connected to the
asbestos surfaces. These items shall be removed from the work area and
returned and reattached to their proper place when the work area has been
decontaminated and final air testing has provided satisfactory results.
d. The contractor shall seal all floor, wall, and ceiling penetrations with suitable
material such as expanding foam insulation before covering the surfaces with
polyethylene sheeting. The contractor then shall seal all openings between the
work area and uncontaminated areas including but not limited to, windows,
doorways, elevator openings, skylights, corridor entrances, floor and sink
drains, air ducts, grills, grates and diffusers with critical barriers consisting of
two layers of polyethylene sheeting taped securely in place or stapled or
fastened by spray-on adhesives, glue beads, or horizontal wood battens or the
equivalent. Floor drains shall be sealed individually and then covered as all
other floor surfaces with two layers of polyethylene sheeting. Separation
barriers may be constructed to support the critical barriers. Separation barriers
shall not black any required means of egress;
NYC-WTC 000128564