Asbestos inspection log, 143 Fulton Street

Machine-extracted title · confidence 95%

Inspection log documenting roof and facade cleanup activities with air sampling at 143 Fulton Street in September 2002.

NYC-WTC_000128068

Folder label: “143 FULTON STREET 1001244, 89/3

Page image
Scanned page image, NYC-WTC_000128068
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 143 FULTON STREET Floor ROOF $ FACADE Z10038 Borough Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Phone NX 11236 (718)531-2900 • Laboratory Name Warren & Panzer Engineers Inc. Address 228 East 45 Street City New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block 89 Inspection Date: AS NOTED Lot Squad # Badge # 3 N/A Basis of Inspection WTC Survey A020 Photos Taken Yes/No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: As NOTED MONDAY SEPTEMBER 30 2002 (0800AM-0800PM) THE CUEAN UP OF THE POCF OF THE PREMISE BEGAN TODAY. A REMOTE DECONTAMINATION UNIT WAS ERECTED EN THE CUEAN PORTIEN DF THE POOF. AIR SAMPUNG FOR THE DAY'S CLEAN UP ACTIVITES LAS PERFORMED B$ DIPO ELEMO (CERTIEICATE # AM 01-14694 EXP 03/03) OF WARPEN E PANZER ENGINEERS. TUESDAY OCTOBER | 200Z (0800AM- 0600PM) THE CUEAN UP OF THE POCF OF THE PREMISE WAS COMPLETED TODAY. AIR SAMPUNG WAS PERFORMED BY DIPO ELEMO OF WARREN & PANZER ENGINGERS. FOUR ALR SAMPLES WERE RUN ON THE ROOF AND ONE AlR SAMPLE LHS PON IN THE STAIRWELL LANDING LEADING TO THE POCF. AT THE COMPLETION OF THE CLEAN UP ACTIVITIES, I CONDUCTED A VISUAL INSPECTION UF THE CUEANED ROOF SURFACES AND I OBSERNED NO VISIBLE LUTC DEBRIS. SATURDAY OCTOBER 5 2002 (0600AM- 1100 LM) THE CIEAN UP OF THE SOLTH FACADE OF THE PREMISE WAS CONDUCTED TODAY. THE CUEAN UP OF THE SOUTH FACADE OF THE ADSACENT PREMISE (141 FULTON ST) OCCURRED SIMULTANEOUSLY. FOR THE PURPESES OF AIR MONITORING, THE FACADES OF THESE TUO FUILDINES WERE TREATED AS ONE WORK AREA. A BOOM TRUCK WAS USED TO ACCESS THE FACADE SURFAGES. AIR SAMPUNG FOR THIS PORTION OF THE CLEANUP WAS PERFORMED BU EDWIN ELLS ICERTIFICATE # AM 00-00613 ELP 10/02) OF WARREN & PANDER. NO VISIBLE CUTC DEBRIS WAS OBSERNED AT THE CONCUUSION DF THE CUEAN UP ACTINITTES, THE CLEAN UP PROSECT IS NOLO COMPLETE. NYC-WTC_000128068

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128068Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · similarity 0.984

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →