Mr Rajappan Radhakrishnan — NYC DEP
133-135 Greenwich Street and 21-23 Thames Street
Airtek Project 05-0701— June 9, 2005
• f. Removal and dispose of roof, flashing and associated roofing material.
g. Obtain and secure all required permits to complete demolition work, including
but not limited to demolition permit, fence permit, sidewalk closing permit,
etc. Cost for obtaining permits is the responsibility of this trade contractor.
h. Upon completion of demolition work, demolition contractor will provide a
"berm" along the foundation walls around the perimeter of the site. The berm
will be used to temporarily support the foundation walls until the excavation /
foundation contractor starts work. The berm will be set on a 45 degree angle
and start from the top of existing foundation wail to the cellar slab,
End
NYC-WTC 000127736
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000127736Source: NYC Law Department, mirrored locally
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.