NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/BINDER - PHASE 1 DECONTAMINATION PLAN
Document / 34 pages

Final Asbestos Report, 21-23 Thames Street, May 2005

Machine-extracted title · confidence 100%

Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.

NYC-WTC_000127695–000127728

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127698
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

5. Window Caulk & Glazing 6. Wall & Ceiling Plaster (White & Brown Coat) 7. Pipe Insulation . 8. Floor Coverings 9. Sheetrock & Joint Compound 10. Pipe Insulation 11. Duct Insulation

Based on the currently recommended sampling and analytical procedures, Airtek recommends that additional sampling is necessary, in order to determine the asbestos content of building materials. 3.0 SUMMARY OF AIRTEK ENVIRONMENTAL'S INSPECTION RESULTS: The asbestos inspection was conducted on 5/26/05 & 5/27/05 and involved a thorough visual examination of all areas and sampling of suspect materials that would be impacted during the proposed demolition.

Airtek Laboratory analysis confirmed the presence of asbestos in the amount greater than 1% within the samples collected from the following material: 1. Flashing 2. Bulkhead Tar 3. Roofing Material 4. Coping Stone Caulk 5. Window Caulk 6. Aircell Pipe Insulation 7. White Block Pipe Insulation

Airtek laboratory analysis determined the samples collected from the following materials to contain less then one percent (<1 %) asbestos.

1. Brick Mortar 2. Coping Stone Mortar 3. Window Glazing 4. Wail Plaster White Coat 5. Wall Plaster Brown Coat 6. Ceiling Plaster White Coat 7. Ceiling Plaster Brown Coat 8. Rubber Tile Mastic 9. Sheetrock & Joint Compound 10. Cementitious Duct Insulation 11. Tile Grout

4.0 CONCLUSIONS AND RECOMMENDATIONS: Asbestos-containing materials, which will be affected by the scope of work, have been positively identified at various locations throughout the building(s). Proper asbestos abatement procedures shall be implemented prior to the commencement of demolition work. All asbestos abatement work shall be performed in accordance with all applicable Federal, State and Local rules and regulations. The abatement project shall be filed with all agencies having jurisdiction over this project, such as USEPA, NYSDOL and NYCDEP. . A licensed abatement contractor must perform the removal of all friable and non-friable ACM. Airtek believes that the implementation of these recommendations will serve to best protect human health and the environment.

NYC-WTC 000127698

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127698Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →