NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/94 FULTON STREET 1079210, 77/21 BN# 1079210
Document / 5 pages

Document Cover Sheet, 94 Fulton Street, 2002

Machine-extracted title · confidence 85%

Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.

NYC-WTC_000127588–000127592

Folder label: “94 FULTON STREET 1079210, 77/21 BN# 1079210

Page image
Scanned page image, NYC-WTC_000127591
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • • Asbestos Inspection Report Premise No. 9A FULTON STREET Floor Zip Borough ROOF $ FACADE 10038 1 Inspector Building Type Dennis Antzoulatos MIXED USE Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address 228 East 45 Street City New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block Inspection Date: As NOTED Lot Squad# Badge# 21 N/A A020 Basis of Inspection T Photos Taken WTC Survey Yes/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: As NOTED MONDAY OCTOBER 21 2002 CONTRACTOR BRINGS MATERIALS AND EQUIPMENT TO THE JOBSITE. THE GFL ELECTRICAL PANEL IS SET UP. • THE CUEAN UP OF THE ROOF OF THE PREMISE BEGAN. AlR SAMPUNG FOR THIS PORTION EE THE CUFAN UP WAS PERFORMED EU CELESTINE NMORKA ICFRTFICATE TA 4H 02-08495 e7p 04/036). WEDNESDAY OCTOBER 23 2000 THE CUSAN UP DF THE POOF OF THE PREMISE CONTINUES. THE CUEAN UP OF THE BETBACK ROGE ARCA BEFAN, AlR SAMPUNG WIS PERFORMED BY YURL BEDIN ICERTIEICATE # AM 96-14947 EXP 02l03) BE WARBON & PANZEE. THURSDAY OCTOBER 24 2002 THE CUEAN UP COOF AND SETTACK AREAS WAS COMPLETED. AUR SAMPUNG WAS PERFCRMED B4 YURI BEDIN. AT THE CONCUISION OF THE CUEAN UP ACTIVITIES, ICONDUCED A VISUAL INSPECTION OF THE CIEANED WORU ADENS AND I •BSERUED NO VISIELE LUTC DEBRIS. SUNDAY OXTOBER 28 2002 (700AM - 200PM) THE CUEAN UP OF THE NORTH FACADE OF THE PREMISE WAS CONDUCTED. AlR SAMFLING WAE PERFORMEO BY WIS SOTO (GEETIFICATE PIl....) ERP 03/03). DUE TO THE DELI OLONER'S REFUSAL TO CLOSE THE CUEAN UP PPOCEDURES AT THE PREMIST MAD TO BE CHANGED. FACADE SURFACES WERE WET WIPED AND HEPA VACUMED INSTEAD OF BEING HEPA VACUUMED AND POLDER LUAEHED, THE REFRIGERATOR UNIT OUTSIDE THE DELL (LOCATED ON THE SIDE WALK) WAS COVERED WITH TUG LAVERS OF PLASTIC AND VEFT IN PLACE. SEVERAR DEL PATRONS CROSGED CAUTON TAPE AND NYC-WTC_000127591

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127591Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →