NYC 9/11 Public Portal Document
130 Cedar Street July 15, 2004
Selective Demolition and Façade Restoration Koenen Associates
b. Price per linear foot for restoring existing shelf angles (removing rust and
painting with rust-inhibiting coating)
•
c. Price per square foot for replacing damaged brick.
d. Price per square foot for patching damaged brick.
e. Price per square foot for repointing bricks.
1.3 DEFINITIONS
A. Low-Pressure Spray: 100 to 400 psi (690 to 2750 kPa); 4 to 6 gpm (0.25 to 0.4 Us).
B. Medium-Pressure Spray: 400 to 800 psi (2750 to 5500 kPa); 4 to 6 gpm (0.25 to 0.4
Us).
C. High-Pressure Spray: 800 to 1200 psi (5500 to 8250 kPa); 4 to 6 gpm (0.25 to 0.4 Us).
1.4 SUBMITTALS
A. Product Data: For each type of product indicated. Include recommendations for
application and use. Include test data substantiating that products comply with
requirements.
B. Samples for Verification: Before erecting mockup, submit samples of the following:
1. Each type of exposed masonry unit to be used for replacing existing units.
a. For each brick type, provide straps or panels containing at least four bricks.
2. Each type of pointing mortar in the form of sample mortar strips, 6 inches (150
mm) long by 1/2 inch (13 mm) wide, set in aluminum or plastic channels.
a. Include with each sample a list of ingredients with proportions of each.
Identify sources, both supplier and quarry, of each type of sand and brand
names of cementitious materials and pigments if any.
C. Restoration Program: For each phase of restoration process, provide detailed
description of materials, methods, equipment, and sequence of operations to be used
for each phase of restoration work including protection of surrounding materials on
building and Project site.
1. Include methods for keeping pointing mortar damp during curing period.
2. If materials and methods other than those Indicated are proposed for any phase
of restoration work, provide a written description, including evidence of
successful use on comparable projects, and a testing program to demonstrate
their effectiveness for this Project.
D. Cleaning Program: Describe cleaning process in detail, including materials, methods,
and equipment to be used and protection of surrounding materials on building and
Project site, and control of runoff during operations.
•
CLAY MASONRY RESTORATION AND CLEANING 04901 -2
NYC-WTC 000125169