NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
NYC-WTC_000125098–000125202Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates
b. Price per linear foot for restoring existing shelf angles (removing rust and painting with rust-inhibiting coating) • c. Price per square foot for replacing damaged brick. d. Price per square foot for patching damaged brick. e. Price per square foot for repointing bricks.
1.3 DEFINITIONS
A. Low-Pressure Spray: 100 to 400 psi (690 to 2750 kPa); 4 to 6 gpm (0.25 to 0.4 Us).
B. Medium-Pressure Spray: 400 to 800 psi (2750 to 5500 kPa); 4 to 6 gpm (0.25 to 0.4 Us).
C. High-Pressure Spray: 800 to 1200 psi (5500 to 8250 kPa); 4 to 6 gpm (0.25 to 0.4 Us).
1.4 SUBMITTALS
A. Product Data: For each type of product indicated. Include recommendations for application and use. Include test data substantiating that products comply with requirements.
B. Samples for Verification: Before erecting mockup, submit samples of the following:
1. Each type of exposed masonry unit to be used for replacing existing units. a. For each brick type, provide straps or panels containing at least four bricks.
2. Each type of pointing mortar in the form of sample mortar strips, 6 inches (150 mm) long by 1/2 inch (13 mm) wide, set in aluminum or plastic channels. a. Include with each sample a list of ingredients with proportions of each. Identify sources, both supplier and quarry, of each type of sand and brand names of cementitious materials and pigments if any.
C. Restoration Program: For each phase of restoration process, provide detailed description of materials, methods, equipment, and sequence of operations to be used for each phase of restoration work including protection of surrounding materials on building and Project site.
1. Include methods for keeping pointing mortar damp during curing period. 2. If materials and methods other than those Indicated are proposed for any phase of restoration work, provide a written description, including evidence of successful use on comparable projects, and a testing program to demonstrate their effectiveness for this Project.
D. Cleaning Program: Describe cleaning process in detail, including materials, methods, and equipment to be used and protection of surrounding materials on building and Project site, and control of runoff during operations.
•
CLAY MASONRY RESTORATION AND CLEANING 04901 -2
NYC-WTC 000125169
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
7 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
8 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
7 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
13 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
13 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
8 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
Similarity score 0.921 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094043
Letter from FEMA providing a list of historic buildings and recommended cleaning treatments for post-disaster recovery.
Similarity score 0.921 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093746
Letter from FEMA providing a list of historic buildings and recommended cleaning treatments for post-disaster recovery.
Similarity score 0.920 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093728
Appendix B outlining performance standards and cleaning requirements for historic building exteriors.
Similarity score 0.919 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
Similarity score 0.918 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Cited alongside this record in an Ask answer
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Cited alongside this record in an Ask answer
NYC-WTC_000167029
Draft lease document outlining premises and terms for the Mayor's Office of Emergency Management at 7 World Trade Center.
Cited alongside this record in an Ask answer
Lease provision defining the landlord's ownership warranty and requirements for final layout and finish plans at 7 World Trade Center.
Cited alongside this record in an Ask answer