OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demolition and Facade Restoration Koenen Associates

SECTION 04901 - CLAY MASONRY RESTORATION AND CLEANING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes restoration and cleaning of brick as follows: 1. Reanchoring brick veneers at concrete pilasters to remain as indicated on Contract Drawings.

2. Replacing/restoring damaged shelf angles and installing flashing and weepholes at shelf angles.

3. Repairing clay masonry, including replacing damaged units. 4. Repointing mortar joints. 5. Removing plant growth. 6. Cleaning exposed clay masonry surfaces.

B. Related Sections include the following: 9 1. Division 4, Section uUnit Masonry" for masonry accessories not specified herein 2. Division 5, Section "Misc. Metals" for metal anchors and coatings 3. Division 7 Section "Joint Sealants" for sealing joints in restored clay masonry.

C. Quantities and Allowances: 1. Architect provided quantity take-offs are for reference only; Restoration Contractor is responsible for verifying all quantities prior to Bid. a. Re-anchoring all brick veneer at pilasters to remain b. Installing flashing and weeps at all shelf angles at pilasters to remain c. Cleaning all exposed brick at pilasters to remain. 2. Allowances for bid purposes: a. 5% replacement of damaged bricks (at pilasters to remain) b. 20% repointing of mortar joints (at pilasters to remain)

D. Unit Prices: Provide unit prices for the following:

1. Unit prices apply to authorized work covered by quantity allowances. 2. Unit prices apply to additions to and deletions from Work as authorized by Change Orders. a. Price per linear foot for replacing galvanized shelf angles (anchorage and steel angle only)

CLAY MASONRY RESTORATION AND CLEANING 04901 -1

NYC-WTC 000125168

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125168Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →