Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125153
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demolition and Facade Restoration Koenen Associates

1. Hazardous material remediation is specified elsewhere in the Contract Documents. See JLC Drawings and specifications for extent of abatement work. 2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

D. Storage or sale of removed items or materials on-site will not be permitted.

E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations. a. Maintain fireprotection facilities in service during selective demolition operations.

PART 2- PRODUCTS

2.1 REPAIR MATERIALS

A. Use repair materials identical to existing materials.

1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. 2. Use materials whose installed performance equals or surpasses that of existing materials.

B. Comply with material and installation requirements specified in individual Specification Sections.

0 PART 3 -EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect.

D. Engage a professional engineer to survey condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of • structure or adjacent structures during selective demolition operations.

E. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

3.2 UT1L Y SERVICES

SELECTIVE DEMOLITION 01732-3

NYC-WTC 000125153

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125153Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.