NYC 9/11 Public Portal Document
130 Cedar Street July 15, 2004
Selective Demolition and Facade Restoration Koenen Associates
2. Interruption of utility services.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Locations of temporary partitions and means of egress.
C. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility
licensed to accept hazardous wastes.
1.6 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work
similar in material and extent to that indicated for this Project.
B. Professional Engineer Qualifications: Comply with Division 1 Section "Quality Requirements."
C. Regulatory Requirements: Comply with governing EPA/DEP notification regulations before
beginning selective demolition. Comply with hauling and disposal regulations of authorities
having jurisdiction.
D. Standards: Comply with ANSI A10.6 and NFPA 241.
E. Predemolition Conference: Conduct conference at Project site to comply with requirements in
Division 1 Section "Project Management and Coordination." Review methods and procedures
related to selective demolition including, but not limited to, the following:
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials,
demolition personnel, equipment, and facilities needed to make progress and avoid
delays.
4. Review requirements of work performed by other trades that rely on substrates exposed
by selective demolition operations.
1.7 PROJECT CONDITIONS
A. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without
written permission from authorities having jurisdiction.
B. Owner assumes no responsibility for condition of areas to be selectively demolished.
1. Conditions existing at time of inspection for bidding purpose will be maintained by
Owner as far as practical.
C. Hazardous Materials: Hazardous materials are present in building to be selectively demolished.
A report on the presence of hazardous materials is on file for review and use. Examine report to
become aware of locations where hazardous materials are present. Quantity schedule is
included in the JLC abatement specification. Contact JLC for access to full report.
•