NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125152
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demolition and Facade Restoration Koenen Associates 2. Interruption of utility services. 3. Coordination for shutoff, capping, and continuation of utility services. 4. Use of elevator and stairs. 5. Locations of temporary partitions and means of egress.

C. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.

1.6 QUALITY ASSURANCE

A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.

B. Professional Engineer Qualifications: Comply with Division 1 Section "Quality Requirements."

C. Regulatory Requirements: Comply with governing EPA/DEP notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

D. Standards: Comply with ANSI A10.6 and NFPA 241.

E. Predemolition Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." Review methods and procedures related to selective demolition including, but not limited to, the following:

1. Inspect and discuss condition of construction to be selectively demolished. 2. Review structural load limitations of existing structure. 3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays. 4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

1.7 PROJECT CONDITIONS

A. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from authorities having jurisdiction.

B. Owner assumes no responsibility for condition of areas to be selectively demolished.

1. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Hazardous Materials: Hazardous materials are present in building to be selectively demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present. Quantity schedule is included in the JLC abatement specification. Contact JLC for access to full report.

SELECTIVE DEMOLITION . 01732-2

NYC-WTC 000125152

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125152Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.