NYC 9/11 Public Portal Document
130 Cedar Street July 15,2004
Selective Demolition and Façade Restoration Koenen Associates
A. Provide and maintain a field office with a telephone and fax machine at a space within the
existing facility. The office shall be complete with light, heat, air conditioning, plan racks,
four-drawer metal file with lock, shelves for samples, tables, chairs, and janitor service.
When it becomes possible to establish an office in the building, office accommodation of
approximately the same size as those in the field offices, including the services above,
shall be provided and maintained until the Issuance of a certificate of substantial
completion. Field and temporary offices shall be removed when no longer required.
Provide a telephone and pay all charges for calls, including long distance calls.
2.07 FIRE PROTECTION
A. Provide and maintain adequate fire protection, ready for instant use, distributed around
the project.
B. Make arrangements for periodical inspection by City of Chicago fire protection authorities
and Insurance underwriters Inspections. Cooperate with said authorities and promptly
carry out their recommendations.
C. Open fire will not be permitted within the building enclosure or on the project site.
2.08 TEMPORARY HEAT AND VENTILATION
A. Provide temporary heat as required during construction to protect the work from freezing
or frost damage, and as necessary to ensure suitable working conditions for the
construction operations of all trades. In areas of the building where work is being
conducted, the temperature shall be maintained as specified in the various sections of
the Specifications, but not less than 45 degrees Fahrenheit. Unless no circumstances
shall the temperature be allowed to reach a level that will cause damage to any portion of
the work which may be subject to damage by low temperatures.
B. Until the building, or any major portion thereof, is enclosed, temporary heating shall be by
smokeless portable unit heaters of type listed by Underwriter's Laboratories, Factory
Mutual, and the Fire Marshall. Pay for fuel, maintenance, and attendants required in
connection with the portable unit heaters. Interior or exterior surfaces damaged by the
use of these space heaters shall be replaced by new materials or be refinished.
C. The building shall be considered enclosed when it has reached the stage when exterior
walls have been erected, the roof substantially completed, exterior openings closed up
either by the permanently glazed windows and doors, or by adequate temporary closing,
and the building is ready for interior masonry and plastering operations.
D. After the building, or any major portion thereof, has been enclosed, the permanent
heating system as specified below may be used for temporary heat.
E. When the permanent heating system, or a suitable portion thereof, is in operating
condition, the system may be used for temporary heating, provided that the Contractor
(1) Obtains approval of the Architect, (2) assumes full responsibility for the entire heating
system, and (3) pays all costs for fuel, operation, maintenance, and restoration of the
system.
F. Provide adequate ventilation as required to keep the temperature of the building within
10 degrees Fahrenheit of the ambient outdoor temperature when such ambient
temperature exceeds 70 degrees Fahrenheit, and to prevent accumulation of excess
moisture or to prevent excess thermal movement In the building.
Construction Facilities and Temporary Controls 01500-3
NYC-WTC 000125132