Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125118
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates

SECTION 01300

SUBMITTALS •

PART 1.00 - GENERAL

1.01 GENERAL REQUIREMENTS

A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents.

1.02 WORK INCLUDED

A. Work of this Section includes all labor, materials, equipment and services necessary to complete submittal requirements as specified herein, including, but not limited to, the following: C- 1. Shop drawings and samples. 2. Manuals. 3. Integrated drawings.

1.03 RELATED WORK

A. Section 01600 — MATERIALS AND EQUIPMENT.

B. General submittal requirements - General Conditions.

PART 2.00 - PRODUCTS

2.01 SHOP DRAWINGS AND SAMPLES

A. General

1. The Contractor shall be responsible for coordinating the schedule for submittal of shop drawings and samples with his progress schedule and the requirements of the Contract Schedule, and submit a coordinated schedule of submission of all shop drawings and samples to the Architect.

2. Failure of the Contractor to schedule and submit shop drawings and samples In ample time for checking, correction, and rechecking will not justify any delay in the Contract Schedule. Allow ample time for items to be tested, Including time for retesting If the tests or mock-ups fail.

3. Samples, shop drawings, manufacturers' literature, and other required Information shall be submitted In sufficient time to permit proper consideration and action on same before any materials and items are delivered on the work. Stagger submissions so that the Architect can review the documents in an orderly and timely manner, All samples of materials requiring laboratory tests

shall be submitted to the laboratory for testing not less than 90 days before such materials are required to be used in the work. All other samples, Manufacturers' literature, and other sample information shall be submitted for approval not less than 30 days before such materials are required to be used in the work.

.. Submittals 01300-1

NYC-WTC 000125118

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125118Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →