NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125116
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates

SECTION 01202

PROGRESS MEETINGS

PART 1.00 - GENERAL

1.01 GENERAL REQUIREMENTS

A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents.

1.02 WORK INCLUDED

A. To enable orderly review of progress during construction and to provide for systematic discussions of problems, the General Contractor will conduct project meetings throughout the construction period.

B. In general, project meetings will be held at the job site in accordance with a mutually r-

acceptable schedule.

C. The purpose of the project meetings is analysis of problems that might arise between the Owner and the Contractor relative to execution of the work.

1.03 RELATED WORK

A. The Contractor's relations with his subcontractors and materials suppliers, and discussions relative thereto, are the Contractor's responsibility as described in the Contract and are not part of project meetings content.

1.04 QUALITY ASSURANCE

A. Persons designated by the Contractor to attend and participate in project meetings shall have all required authority to commit the Contractor to solutions as agreed upon in the project meetings.

1.05 SUBMITTALS

A. Agenda Items: To the maximum extent possible, advise the Architect at least twenty- four (24) hours in advance of the project meeting regarding all items to be added to the agenda.

B. Minimum Agenda

1. Review work progress since last meeting. 2. Note field observations, problems and decisions. 3. Identify problems which impede planned progress. 4. Review off-site fabrication problems. 5. Develop corrective measures and procedures to regain schedule. 6. Coordinate projected progress with other prime contractors. 7. Review submittal schedules, expedite as required to maintain schedule.

C. Minutes: The Contractor will compile minutes of each project meeting and will distribute copies to the Owner and the Architect. The Contractor shall make and distribute such other copies as he wishes.

.. Progress Meetings 01202-1

NYC-WTC 000125116

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125116Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →