Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125199
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Carpentry

B. Stair Protection: Provide wood protection for stairs: cover finished threads. Protect platforms, treads and rises with dressed planking full stair width; hold in place with continuous edge strips. Erect required handrails and railings for closing in open wells and open sides of stairs. Protect railing from damage. Protect door sills and saddles.

C. Openings in Floors and Roofs: Protect openings In floor and roof slabs with adequate wood railings, substantially framed, braced and nailed. Cover openings not required to be kept open with not less than two (2) inches thick planking, cleat together, brace; make sufficiently strong and secure. Protect openings in floors and roofs immediately after forms are removed.

D. Exterior Openings_Provide temporary enclosures for exterior openings where required, properly secured and maintained until finished work Is inn place. Provide a sufficient number of temporary doors to give access to the building, all provided with hardware, locks and keys.

E. Maintenance: Maintain all temporary protection in good repair during the constructive period. Remove when no longer required.

F. Temporary Locks: Provide temporary locks, Including keys, for temporary doors. Use of permanent building hardware in connection with temporary doors is prohibited.

3.08 CLEANING-UP

A. General: Keep the premises in a neat, safe and orderly condition at all times during execution of this portion of the work, free from accumulation of sawdust, cut-ends and debris.

B. Sweeping

1. At the end of each working day, or more often If necessary, thoroughly sweep all surfaces where refuse from this portion of the work has settled.

2. Remove the refuse to the area of the job site set aside for its storage.

3. Upon completion of this portion of the work, thoroughly broom clean all surfaces.

END OF SECTION

NYC-WTC 000125199

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125199Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →