Carpentry
B. Stair Protection: Provide wood protection for stairs: cover finished threads. Protect
platforms, treads and rises with dressed planking full stair width; hold in place with
continuous edge strips. Erect required handrails and railings for closing in open wells and
open sides of stairs. Protect railing from damage. Protect door sills and saddles.
C. Openings in Floors and Roofs: Protect openings In floor and roof slabs with adequate
wood railings, substantially framed, braced and nailed. Cover openings not required to be
kept open with not less than two (2) inches thick planking, cleat together, brace; make
sufficiently strong and secure. Protect openings in floors and roofs immediately after
forms are removed.
D. Exterior Openings_Provide temporary enclosures for exterior openings where required,
properly secured and maintained until finished work Is inn place. Provide a sufficient
number of temporary doors to give access to the building, all provided with hardware,
locks and keys.
E. Maintenance: Maintain all temporary protection in good repair during the constructive
period. Remove when no longer required.
F. Temporary Locks: Provide temporary locks, Including keys, for temporary doors. Use of
permanent building hardware in connection with temporary doors is prohibited.
3.08 CLEANING-UP
A. General: Keep the premises in a neat, safe and orderly condition at all times during
execution of this portion of the work, free from accumulation of sawdust, cut-ends and
debris.
B. Sweeping
1. At the end of each working day, or more often If necessary, thoroughly sweep all
surfaces where refuse from this portion of the work has settled.
2. Remove the refuse to the area of the job site set aside for its storage.
3. Upon completion of this portion of the work, thoroughly broom clean all surfaces.
END OF SECTION
•