NYC 9/11 Public Portal Document
NYC DEP ACP Fax:7185953648 Feb 28 2005 17:07 P.16
NYC DEP Asbestos and Lead Control Program VAR #
ATTACHMENT EC
APPLIES To VARIANCE FROM TITLE 15, CHAPTER 1, OF THE RULES OF THE CITY OF NEW YORK,
SECTIONS 1-41(c), 1-41(d), 1-81(m), 1-82(a), 1-53(a), and 1-91.
(For Small Projects exclude 1-81(m), 1-82(a), 1-83(a), and 1-91, and add 1-l06)
REQUIREMENTS FOR ABATEMENT OF ACM CAULKING MATERIALS FROM BUILDING FACADES
1. All windows and other openings within 20 feet of the affected ACM caulking
material shall be fully closed or otherwise sealed with*two layers of
plastic. This includes openings on the same floor and also openings on
immediately adjacent floors above and below.
2. The inside frames of the windows and other openings within the affected
adjacent interior space shall, be fully plasticized with one (1) sheet of
6-mil plastic. The seal shall be airtight between the window (or other
opening) and the building interior.
3. Any scaffolding erected shall be constructed, maintained, and operated in
accordance with the applicable federal, state, and city rules and
regulations.
4. At the base of the scaffolding (either upon the sidewalk tunnel or at
grade level), a work place or restricted area shall be established. This
space shall be plasticized with one (1) layer.of 6-mil plastic from one
(1) foot up the building exterior wall to the edge of the sidewalk tunnel
or at least five (5) feet away, whichever is greater. It shall cordoned
off with clearly identifiable asbestos hazard tape. This space (except the
decon) shall be replasticized at the end of each shift.
S. The remote worker/waste decontamination enclosure system, constructed in
accordance with Attachment D, shall be erected at ground level. This unit
shall be maintained in the work place for the duration of the abatement.
6. The elevated platform shall be at least one (1) foot below the surface or
joint to be abated. This work area shall be plasticized with a single
layer of 6-mil plastic. The plastic shall extend up from the platform to
a minimum height of two (2) feet on three sides. The plastic on the side
facing the facade shall be attached directly to the building just below
the surface or joint to be abated.
7. At the begin ng
of each shift, an area sample shall be taken on the
scaffolding to obtain at least one (1) sample. Independent third parties
shall perform air sampling.
8. If area air samples taken within the building interior are below 0.01
f/cc, or the measured background level, no further clearance air samples
will be required.
9. Personnel performing the work shall be NYS/NYC certified asbestos
handlers. An NYS/NYC certified asbestos handler/supervisor shall be in
the work place at all times during the ACM caulking abatement. The
asbestos handler/supervisor shall establish and maintain a log as that
term is. defined at 15 RCNY 9 1-02.
- 1 of 2 - TRU/mpd 10/99