NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/BINDER - PHASE 1 DECONTAMINATION PLAN
Document / 20 pages

Asbestos Project Notification Form

Machine-extracted title · confidence 90%

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

NYC-WTC_000127792–000127811

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127810
OCR text

OCR status: ok · source: pdftotext

NYC 9111 Public Portal Document

NYC DEN ASBESTOS CONTROL PROGRAM VAR#

ATTACHMENT IC •

APPLIES TO VARIANCE FROM TITLE 15, CHAPTER 1, RULES OF THE CITY OF NEW YORK, SECTIONS 1-41(c), 1-41(d), 1-81(m), 1-82(a), 1-83(a) and 1-91. [For Small Projects exclude 1-81(m), 1-82(a), 1-83(a) and 1-91, and add 1-106]

REQUIREMENTS FOR ABATEMENT OF ACM CAULKING MATERIALS FROM THE TOP OF THE PARAPET WALL(S) ON TEE ROOF

1. The entire roof is considered the work area, unless barriers are use to identify and restrict the work area.

2. All openings on the roof and other openings/windows within 20 feet of the affected ACM coping stone caulking material shall be fully closed or sealed with one layer of plastic.

3. Roof surfaces extending 5 feet on both sites and 6 feet in front shall be covered with at least i layer of 6 mil plastic, along the length of the parapet wall to be abated. The plastic layers• on the roof surfaces shall extend 6° inches up the parapet wall.

• 4. At the base of the building, directly below the parapet wall to be abated, a restricted area shall be established. This space shall be plasticized with 1 layer of 6-mil plastic from 6 inches up the building exterior wall to the edge of the sidewalk at least 5 feet away. It shall be cordoned off with clearly identifiable asbestos hazard tape. At the end of each shift, the plastic has to be cleaned, removed and disposed as asbestos waste.

5. The remote worker/waste decontamination enclosure system, shall be constructed in accordance with Attachment D, and shall be erected on the roof of the building. This unit shall be maintained in the work place for the duration of the abatement.

6. Each work area shall be supplied with appropriate tools, rags, a portable supply of amended water, and a HEPA vacuum. After the ACM coping stone caulking material is adequately wetted, it shall be stripped using hand tools. The stripped joints shall then be HEPA vacuumed, and then wet-wiped, to remove any loose debris still .in place or on the poly. All exposed joints shall be coated with a clear encapsulant.

7. All ACM caulking material shall be bagged directly on detachment from the substrate.

1

NYC-WTC 000127810

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127810Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127779

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

30 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.992

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →