Asbestos removal variance correspondence, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.

NYC-WTC_000125698–000125753

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125729
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 01/17/2005 01:42 17325653654 NOVA DEVELOPMENT GRP PAGE 12

.. VAR # 19YC DEP Asbestos end Lead Coutrol•Program

ATTAC1* ENT EC

CITY OF NEW YORK, APFLTRs- To VARrAl9CE FROM TITLE 15, Ct3APTER 1, OF TRB.RurEa OF THE '.sE OI &ad Ec).4 1-4.(d) , 1-81(so), .1-82(a).. .1-83(a), and 1-97.. a-41

(For mail Projects exclude 1-81(m), 1-82(a), 1-83(a), and 1-51, and add 1-106)

REQUZREMKNT9 FOR AR TSMEN'• O) Aca4 CAULKD O MATERIALS FROM SVZLDING FACADES

I. All windows and other openings within 20 feet of one affected AC>d caulking material shall be fully closed or otherwise sealed with two layers of plastic. Tbi,s includes openings on the •same floor and also openings on immediately adjacent floors above and below.

2. The inside frames of the .windows and other openings within the affected adjacent interior apace shall be fully plasticised with one (1) sheet of 6-mil plastic. The seal shall be airtight between the window (or other opening) and the building interior,

3. Any scaffolding erected shall be constructed, maintained, and operated in accordance with the applicable federal, * state, and city rules and regulations.

4. At the base of the scaffolding (either upon the sidewalk tunnel or at grade level), a work place or restricted area shall be established. This • space shall be plasticised. with one (1) layer of 6-mil, plastic from one (1) toot up the building exterior wall to the edge of the sidewalk turmel or -at least five (5) feet away, whichever is greater. It shall cordoned off with clearly identifiable asbestos hazard tape. This space (except the decon) shall be replasticised at the end of each shift. 5. The remote worker/waste decontamination enclosure system, constructed in accordance with Attachment D, shall be erected at ground level. This unit shall be maintained in the work place for the duration of the abatement.

G. The elevated platform shall be at least one (1) foot below the surface or joint to be abated. This work area shall be plasti iced with a single layer of 6-mil plastic. The plastic shall extend up from the platform to a minimum height of two (2) feet on three sides. The plastic the on 'side

facing the facade shall be attached directly to the building just below the surface or joint to be abated.

7. At the beginning Iof each shift, an area sample shall be taken on the scaffolding to obtain, at least one (1) sample. rndependemt third parties shall perform air sampling. 8. If area air samples taken within the building interior are below 0.01 f/co, or the measured background level, no further clearance air samples will be required.

9. Personnel performing the, work shall • be NY8/NYC certified asbestos handlers. An NYS/NYC certified asbestos handler/supervisor shall be in the work place at all times during the ACM caulking abatement. The asbestos handler/supervisor shall establish and maintain a log as that term is defined at 15 ROSY 5 1-02. i\I - 1 of 2 - TRU/mpd •

NYC-WTC 000125729

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125729Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →