NYC 9/11 Public Portal Document
ONLY TYPEWRITTEN
APPLICATIONS WILL BE
ACCEPTED
I. FACILITY
ADDRESS:
TYPE OFFACILITY:NYC AGENCY
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION
TOTAL FEET:
27725
ASBESTOS INSPECTION REPORT Basis of Inspection:
SF
TRU1127MNO2
NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
OF START OF THE WORK (ABATEMENT ACTIVITIES)
FEE EXEMPT: Yes
1. $0.00
30
29
26
22
19
16
2,500
2,000
2,000
2,500
650
START DATE:
7/19/02 COMPLETION DATE:
8/1/02
7,450
500
29 BROADWAY
Cyar
Cyar
675
9,450
LF
BORO: MANHATTAN ZIP: 10004
BLOCK: 20
LOT: 1
II. BUILDING OWNER
NAME: TRINITY MORRIS CORP
TEL. #: (212) 425•2950
ADDRESS: n/a n/a n/a
CITY: n/a
IV.ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORP
TEL #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION #:
ADDRESS: 14:20 129TH STREET
CITY: COLLEGE POINT STATE:
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. N: (212) 922-0077
ADDRESS:: 228 EAST 45TH STREET
VI LABORATORY FOR SAMPLE ANALYSIS
STATE: n/a ZIP: n/a
ZIP: 11356
CITY: NEW YORK
STATE: NY/
ZIP: 10017
NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE L] DAYV EVENING V NIGHT
V WEEKENDS
V WEEKDAYS
SQUAD #:
INSPECTOR NAME R.Rarmmohan
DATE OF INSPECTION:
7/24 /02 TIME OF INSPECTION: Fróm:
8
To:
Contact at site: Jen Wolkowicz and Seven Haudlers.
Inspection disclosed that the following sections were complied with: (Check all that apply)
1-51 -Notifications, Reports, Pla
1-71 - Air Sampling and Monitorin
1-101 Materials and Equipment
1-116 - Work Place Preparation
1-118 - Waste Decontamination System
1-126- Engineering Controls
1-129• Maintenance of Barriers
1-138Encapsulation
BADGE #:A-18
AM
PM
AM
PM
X
Robert: SiDraper,
wap
1-91 • Worker Protection
1-117 • Worker Decontamination System
1-127 - Entry/Exit Procedures
1-140 - Glovebag
1:146 - Preliminary Clean-up
Project not started
1-141 - Tent
1•139 • Enclosure
1-137: ACM Disturbance, RemoveL,_Handling
1-147 - Final Clean-up
Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about
Ail sürfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on
Samples taken:
No
Yes
19" Floor set back Vaccummg and cleaning Started
y a cres tes hantler.
On 6t floor selbade wilt coolng wnits begoi by 4Haudtrs
At the end of te day bork te 19 and 6u floors
cuere completal
BORO
1 = MANHATTAN
.2= BRONX
3 = BROOOKLYN 4 = QUEENS
5 = STATEN ISLAND
RESULT CODES
1 = VIOLATION ISSUED
2 = NO VIOLATION ISSUED
3 - NO ACCESS
4 = PROJECT NOT STARTED (NO NOV)
5 = PROJECT COMPLETED (NO NOV)
NYC-WTC_000123579
RESULT CODE
SUPERVISOR INITIALS
OCR can misread numbers and units. Confirm readings against the page image before using them.