I. FACILITY
ADDRESS:
TYPE OFFACILITY: NYC AGENCY
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION
TOTAL FEET: 27725
ASBESTOS INSPECTION REPORT Basis of Inspection:
LEL
SF
TRU1127MN02
30
2,500
29
2,000
NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
OF START OF THE WORK (ABATEMENT ACTIVITIES)
•FEE EXEMPT: Yes
26
1. $0.00
22
2,000
2,500
650
7,450
START DATE:
7/19/02 COMPLETION DATE:
8/1/02
29 BROADWAY
6
Cyar
Cyar
500
675
9,450
LF
BORO: MANHATTAN ZIP: 10004
BLOCK: 20
LOT: 1
IIL BUILDING OWNER
NAME: TRINITY MORRIS CORP
TEL. #: (212) 425-2950
ADDRESS: n/a n/a n/a
CITY: n/a
STATE:
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORP
TEL. #: (718)961-4100
FEDERAL EMPLOYER IDENTIFICATION #
ADDRESS: 14-20 129TH STREET
CITY: COLLEGE POINT STATE:
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET
VI. LABORATORY FOR SAMPLE ANALYSIS
n/a ZIP: n/a
NY 2IP: 11356
ASBESTOS WORK SCHEDULE ] DAY
CITY: NEW YORK
STATENY
ZIP: 10017
NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
V EVENING V NIGHT
•V WEEKENDS
M WEERDAYS
INSPECTOR NAME
DATE OF INSPECTION:
R.RAMMOHIAN
SQUAD #:
7/23 /02 TIME OF INSPECTION: From:
BADGE #:
AM
X
A018
PM
Contact at ste: Mr Phillip, B1dg Mgr. / Joe Bonder, proj. mgr
Inspectión disclosed that the following sections were complied with: (Check all that apply)
1-51 Notifications, Reports Pla
1-71 - Air Sampling and Monitorin
• 1-116- Work Place Preparation
1-91 - Worker Protection
1-101 - Materials and Equipment
•1-118 - Waste Decontamination System
1-117 - Worker Decontamination System:
1-129- Maintenance of Barriers
1-126 Engineering Controls
1-138 Encapsulation
1-141- Tent
1-127 - Entry/Exit Procedures
1-139• Enclosure
1-140 -Glovebag
1-146• Preliminary Clean-up
Project not started
1-137 : ACM Disturbance, RemoveL, Handling
1-147 - Final Clean-up
Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about
All surfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on
Samples taken:
No
Yes
5
6
Photos taken:
Yes
No
Acational comments: Mobilization stanted at 8i30 ain. to the 6 l fleor vacout
area ae decra wuh hit bet
wee ind decn was sehup. Robert S Draper AH01- 0196 came A
Ban aid said tat it was kis ord progect and wovle
need help is setting op tomps and fillug ovt his paper work ana !
edvised hin to contact his siperison Later lovis Soto, and Festy Me turo
air samphing Techricious came from otter yones and tramed th. Droper.
Mau yoef
vacchming and cleauing completed at the eid of
the day.
BORO
1 = MANHATTAN
RESULT CODES
2- BRONX*
3 - BROOOKLYN
4 = QUEENS
5 = STATEN ISLAND
1 = VIOLATION ISSUED:
2 = NO VIOLATION ISSUED
3= NO ACCESS
4 = PROJECT NOT STARTED (NO NOV) :
5 = PROJECT COMPLETED (NO NOV)
NYC-WTC_000123578
RESULT CODE
2
PRORATAS