NYC 9/11 Public Portal Document
ONLY TYPEWRITTEN
APPLCATIONS WILL BE
ACCEPTED
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION
TOTAL FEET: 3940
ASBESTOS INSPECTION REPORT Basis of Inspection:
SF
[TRU1455MNO2
roof
1,940
roof
2,000
NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED™ FEE EXEMPT: Yos
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
1. $0.00
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE:
9/10/2002 COMPLETION DATE:
9/17/2002
LF
I. FACILITY
ADDRESS:
52 WILLIAM STREET
TYPE OFFACILITY:
BORO: MANHATTAN ZIP:
BLOCK:
LOT:
II. BUILDING OWNER
NAME: FINANCIAL DISTRICT ASSOCIATES LLC
TEL. #:
ADDRESS: n/a n/a
CITY:
STATE:
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORP
TEL. #: (718) 961-4100
FEDERAL EMPLOYER IDENTIFICATION #:
Pii
ADDRESS: 14-20 129TH STREET
CITY: COLLEGE POINT
STATE: NY
V. THIRD PARTY AIR MONITOR
NAME:
WARREN & PANZER ENGINEERS, P.C.
TEl: #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET
VI. LABORATORY FOR SAMPLE ANALYSIS
ZIP:
ZIP: 11356
ASBESTOS WORK SCHEDULE • DAY
CITY: NEW YORK
STATE: NY
ZIP: 10017
NAME: WKP LABORATORIES C/O WARREN & PANZER
NYS ELAP #: 11251
V EVENING
• NIGHT
WEEKENDS
V WEEKDAYS
INSPECTOR NAME:
R.Rammohan
SQUAD #:
BADGE #:
A078
DATE OF INSPECTION: 11/21/02-11/22/O2 TIME OF INSPECTION: From:
8 ам
AM
X
PM
Contact at oit: Jan Wolkowicz+ 5 Handlors, Trio
Inspection disclosed that the following sections were complied with: (Check all fhat applyl
*bipo slomeg as ep
1-51 - Notifications, Reports, Plan
1-71 - Air Sampling and Monitoring
1-101 - Materials and Equipment
1-116 - Work Place Preparation
1-118 - Waste Decontamination System
1-126 - Engineering Controls
1-129 - Maintenance of Barriers
1-138 - Encapsulation
1-140 - Glovebag
1-141 - Tent
1-91 - Worker Protection
1-117 - Worker Decontamination System
1-127 - Entry/Exit Procedures
1-139 - Enclosure
1-137 - ACM Disturbance, RemoveL, Handling
1-146 - Preliminary Clean-up
1-147 - Final Clean-up
Project not started
• Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about:
• All surfaces, including abated surfaces are free of visible ACM and encapsulate
Follow up necessary on
Samples taken:
No
Yes
6
Photos taken:
Yes
No
Additional comments: 11/21/02 : Crew
begau bagging dolons
- tu Floor
setback and air samphing
was performed by Dipo slemez. Due
to overwhelawig
amount
If concrete and sand fiom 'saudblastarg
mone ttuau
waste
bags were generated. All the butke was
removed.
11/22/02 : fin al
Cleaning
washing began
by thro hamdlers.
Thee foreman aud
two haudlers
went to the roof of stair-cose
aud
nitchen stiaust and begau cleaning. The cleung was
completed at the and of te day and alt
the waste bage were
rmoved fuom the preuises.
BORO
RESULT CODES
1 = MANHATTAN
2 = BRONX
3 = BROOOKLYN
4 = QUEENS
5 = STATEN ISLAND
1 = VIOLATION ISSUED
2 = NO VIOLATION ISSUED
3 = NO ACCESS
4 = PROJECT NOT STARTED (NO NOV)
5 = PROJECT COMPLETED (NO NOV)
RESULT CODE
5
SUPERVISOR INITIALS
NYC-WTC_000113710
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000113710Source: NYC Law Department, mirrored locally
License agreement between NYC DEP and a landowner dated October 2002 regarding the removal of foreign material from building exteriors at 130 Water Street.