NYC 9/11 Public Portal Document
ONLY TYPEWRITTEN
APPLCATIONS WILL BE
ACCEPTED
I FACILITY
ADDRESS:
TYPE OFFACILITY:NYC AGENCY
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION
TOTAL FEET/
27725
ASBESTOS INSPECTION REPORT Basis of Inspection:
FL
SE
TRU1127MN02
30
2,500
29
NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
OF START OF THE WORK (ABATEMENT ACTIVITIES)
FEE EXEMPT: Yes
2,000
26
2,000
1: $0:00
22
2,500
19
650
START DATE:
7,450
7/19/02
COMPLETION DATE:
8/1/02
500
29 BROADWAY
Cyar
Cyar
675
9,450
BORO: MANHATTAN ZIP: 10004
BLOCK: 20
LOT: 1
II. BUILDING OWNER
NAME: TRINITY MORRIS CORP.
TEL. # (212) 425-2950
ADDRESS:n/a n/an/a
IV. ASBESTOS ABATEMENT CONTRACTOR
CITY: n/a
STATE: n/a ZIP: n/a
NAME:.. TRIO ASBESTOS REMOVAL CORP
TEL. #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION # :
ADDRESS: 14-20 129TH STREET
CITY: COLLEGE POINT STATE:
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET
VI. LABORATORY FOR SAMPLE ANALYSIS
NY*
ZIP: 11356
10017
NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULEJDAYV EVENINGV NIGHTV WEEKENDS
V WEEKDAYS
INSPECTOR NAME:
DATE OF INSPECTION:
R.Ramonohan
7/27 /02 TIME OF INSPECTIÓN: From:
SQUAD #:
Sam
BADGE #:
Ao t8
X
PM
AM
Contact at ite: Jan Wolkowicy. +6 haudlers
To:
6 pm
AM
PM:
David Ezekwesili, wøp
Inspection disclosed that the following sections were complied with: (Check all that apply)
1-51 • Notifications, Reports, Pla
1-71 - Air Sampling and Monitorin
1-91 - Worker Protection
1-101 - Materiais and Equioment
1-116 - Work Place Preparation
1 117- Worker Decontamination System
1127• Entry/Exit Procedures
1-118 Waste Decontamination System
1-129 • Maintenance of Barriers
1•126 • Engineering Controls:
1-138• Encapsulation
1-139 - Enclosure
1-140 Glovebag
1 146 - Preliminary Clean up
Project not started
1•141• Tent
1-137 -ACM Disturbance, RemoveL, Handling
1-147 . Final Clean-up
Inspection
révealed alf ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about
All surfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on
Samples taken:
No
Yes
3
6
Photos takén:
Yes
No
Aditional comments 26 Flosr setback vacdoming and cleanung started
visual ünspection wos setisfactory at
22nd flaor setback cleaming started ot 3pm.
aul completad at 5:30pm.
BORO
1 = MANHATTAN
2 = BRONX
3 = BROOOKLYN
RESULT CODES
1 = VIOLATION ISSUED
2 - NO VIOLATIÓN ISSUED
4 = PROJECT NOT STARTED (NO NOV)
4= QUEENS
5 = STATENISLAND
:3 = NO ACCESS
5 = PROJECT COMPLETED (NO NOV)
NYC-WTC_000123580
RESULT CODE
SUPERVISOR INITIALS
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000123580Source: NYC Law Department, mirrored locally