Document / 18 pages

Asbestos removal invoice, 29 Broadway, Aug 2002

Machine-extracted title · confidence 95%

Invoice from Asbestos Removal Corp dated August 6, 2002 for roof cleanup services at 29 Broadway.

NYC-WTC_000123541–000123558

Folder label: “29 BROADWAY 1000802, 20/1”

Page image
Scanned page image, NYC-WTC_000123556
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document ONLY TYPEWRITTEN APPLICATIONS WILL BE ACCEPTED I. FACILITY ADDRESS: TYPE OFFACILITY: NYCAGENCY NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 27725 ASBESTOS INSPECTION REPORT Basis of Inspection: SF TRU1127MN02 30 2,500 NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 29 2,000 FEE EXEMPT. Yes 26 2,000 TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE .1. $0.00 OF START OF THE WORK (ABATEMENTACTIVITIES) 22 2,500 19 650 START DATE: 7/19/02 COMPLETION DATE: 8/1/02 7,450 500 Cyar 675 29 BROADWAY BORO: MANHATTAN ZIP: 10004 Cyar 9,450 BLOCK: 20 LOT: 1 II. BUILDING OWNER NAME: TRINITY MORRIS CORP. TEL. #: (212) 425-2950 ADDRESS: n/a n/a n/a IV. ASBESTOS ABATEMENT CONTRACTOR CITY: n/a STATE: n/a ZIP: n/a NAME: TRIO ASBESTOS REMOVALCORP TEL: #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION # : PII ADDRESS: 14•20 129TH STREET CITY: COLLEGE POINT STATE NY V. THIRD PARTY AIR MONITOR NAME: WARREN & PANZER ENGINEERS, P.C. TEL. #: (212) 922•0077 228 EAST 45TH STREET VI. LABORATORY FOR SAMPLE ANALYSIS ZIP: 11356 ASBESTOS WORK SCHEDULE] DAYVEVENING CITY: NEW YORK STATE: NY 2IP: 10017 NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP#: 11251 VI NIGHT M WEEKENDS V WEEKDAYS INSPECTOR NAME* R.Rammohan SQUAD #: BADGE #: AoT8 DATE OF INSPECTION: 7/24/02 TIME OFINSPECTION: From: AM PM AM PM Contact at ste: Jen Wolkowicz and Seven Handlens. X Inspection disclosed that the following sections were complied with; (Check all that apply) Robert S. Droper WAP. 1.51 - Notifications, Reports, Pla 1-71 - Air Sampling and Monitorin 1-91 - Worker Protection 1-101- Materials and Equipment: •1-116: Work Place Preparation 1-117 • Worker Decontamination System 1-118 - Waste Decontamination System 1:126 - Engineering Controls 1-127 - Entry/Exit Procedures 1-129 - Maintenance of Barriers 1-138 • Encapsulation I-140 - Glovebag 1-141. Tent 1-139 Enclosure 1-137 -ACM Distürbance, RemoveL,_Handling 1-146- Preliminary Clean-up: 1-147- Final Clean-up Project not started :Inspection revealed all ACM to be intact. New start date: Project ongoing, expected completion date: Project completed on or about All surfaces, including abated surfaces are free of visible ACM and encapsulat Follow up necessary on Samples taken: No Yes Photos taken: Yes X No Addttonat comments 19" Floer set back Vaccuming and cleaning started by a cneu of 3 handless.. On 6t floor setbade witt cooling vnite begou by 4 Handtns. At the end of the day bokk the 19t and 6" floors wese completedi BORO 1 - MANHATTAN 2 = BRONX: RESULT CODES 1 = VIOLATION ISSUED 3 - BROOOKLYN 4 = QUEENS 2 = NO VIOLATION ISSUED 5 - STATEN ISLAND 3 = NO ACCESS 4 = PROJECT NOT STARTED (NO NOV)/ 5 = PROJECT COMPLETED (NO NOV) NYC-WTC_000123556 RESULT CODE SUPERVISOR INÍTIALS

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000123556Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →