NYC 9/11 Public Portal Document
ONLY TYPEWRITTEN
APPLICATIONS WILL BE
ACCEPTED
I. FACILITY
ADDRESS:
TYPE OFFACILITY: NYCAGENCY
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION
TOTAL FEET: 27725
ASBESTOS INSPECTION REPORT Basis of Inspection:
SF
TRU1127MN02
30
2,500
NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED
29
2,000
FEE EXEMPT. Yes
26
2,000
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
.1. $0.00
OF START OF THE WORK (ABATEMENTACTIVITIES)
22
2,500
19
650
START DATE:
7/19/02 COMPLETION DATE:
8/1/02
7,450
500
Cyar
675
29 BROADWAY
BORO: MANHATTAN ZIP: 10004
Cyar
9,450
BLOCK: 20
LOT: 1
II. BUILDING OWNER
NAME: TRINITY MORRIS CORP.
TEL. #: (212) 425-2950
ADDRESS: n/a n/a n/a
IV. ASBESTOS ABATEMENT CONTRACTOR
CITY: n/a
STATE: n/a
ZIP: n/a
NAME: TRIO ASBESTOS REMOVALCORP
TEL: #: (718) 961-4100
FEDERAL EMPLOYER IDENTIFICATION # :
PII
ADDRESS: 14•20 129TH STREET
CITY: COLLEGE POINT
STATE NY
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922•0077
228 EAST 45TH STREET
VI. LABORATORY FOR SAMPLE ANALYSIS
ZIP: 11356
ASBESTOS WORK SCHEDULE] DAYVEVENING
CITY: NEW YORK
STATE: NY
2IP: 10017
NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP#: 11251
VI NIGHT
M WEEKENDS V WEEKDAYS
INSPECTOR NAME*
R.Rammohan
SQUAD #:
BADGE #:
AoT8
DATE OF INSPECTION:
7/24/02 TIME OFINSPECTION: From:
AM
PM
AM
PM
Contact at ste: Jen Wolkowicz and Seven Handlens.
X
Inspection disclosed that the following sections were complied with; (Check all that apply)
Robert S. Droper WAP.
1.51 - Notifications, Reports, Pla
1-71 - Air Sampling and Monitorin
1-91 - Worker Protection
1-101- Materials and Equipment:
•1-116: Work Place Preparation
1-117 • Worker Decontamination System
1-118 - Waste Decontamination System
1:126 - Engineering Controls
1-127 - Entry/Exit Procedures
1-129 - Maintenance of Barriers
1-138 • Encapsulation
I-140 - Glovebag
1-141. Tent
1-139 Enclosure
1-137 -ACM Distürbance, RemoveL,_Handling
1-146- Preliminary Clean-up:
1-147- Final Clean-up
Project not started
:Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about
All surfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on
Samples taken:
No
Yes
Photos taken:
Yes X No
Addttonat comments 19" Floer set back Vaccuming and cleaning started
by a cneu of 3 handless..
On 6t floor setbade witt cooling vnite begou by 4 Handtns.
At the end of the day bokk the 19t and 6" floors
wese completedi
BORO
1 - MANHATTAN
2 = BRONX:
RESULT CODES 1 = VIOLATION ISSUED
3 - BROOOKLYN 4 = QUEENS
2 = NO VIOLATION ISSUED
5 - STATEN ISLAND
3 = NO ACCESS
4 = PROJECT NOT STARTED (NO NOV)/ 5 = PROJECT COMPLETED (NO NOV)
NYC-WTC_000123556
RESULT CODE
SUPERVISOR INÍTIALS
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000123556Source: NYC Law Department, mirrored locally